LIUJuan,XIANGXu-wen,SHENJun,et al.Application of Bardenpho, MBBR and Magnetic Flocculation and Precipitation Process in the Upgrading and Reconstruction of a Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(4):70-74.
Bardenpho+MBBR+磁絮凝沉淀用于污水厂升级改造
- Title:
- Application of Bardenpho, MBBR and Magnetic Flocculation and Precipitation Process in the Upgrading and Reconstruction of a Wastewater Treatment Plant
- 摘要:
- 山东某污水处理厂设计规模为10×104 m3/d,处理工艺为“预处理+水解池+A2/O生化池+絮凝斜板沉淀池+纤维转盘滤池+接触消毒池”,出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准。新的环保要求出水COD≤30 mg/L、NH3-N≤1.5 mg/L、TN≤10 mg/L、TP≤0.3 mg/L,因此采用Bardenpho+MBBR+磁絮凝沉淀组合工艺对污水厂进行升级改造。该工艺最大限度地利用了现有池体,并在不停水的前提下完成了提标改造,不仅节省了投资,而且提高了处理效率,出水水质稳定达标,系统整体更耐冲击且运行更稳定。
- Abstract:
- The design scale of a wastewater treatment plant in Shandong is 10×104 m3/d, and the treatment process consisted of pretreatment, hydrolysis, A2/O, flocculation and inclined plate settler, fiber rotary table filter and contact disinfection. The effluent quality was required to meet the first level A limit specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). However, the new discharge standard requires that the COD, NH3-N, TN and TP in effluent were no more than 30 mg/L, 1.5 mg/L, 10 mg/L and 0.3 mg/L, respectively. Therefore, the combined process of Bardenpho, MBBR and magnetic flocculation and precipitation was adopted to upgrade the wastewater treatment plant. The process maximized the use of the existing tanks, and completed the upgrading project under the premise of uninterrupted wastewater treatment, which saved the investment and improved the treatment efficiency. The effluent quality stably met the discharge standard, and the whole system was more impact-resistant and operated more stably.
相似文献/References:
[1]孙庆花,张晓霞,赵益华,等.天津某高盐高排放标准污水厂提标改造工程设计[J].中国给水排水,2021,37(8):83.
SUN Qing-hua,ZHANG Xiao-xia,ZHAO Yi-hua,et al.Design of a Wastewater Treatment Plant Upgrading Project with High Salinity Influent and High Discharge Standard in Tianjin[J].China Water & Wastewater,2021,37(4):83.
[2]虞佳庆,武丹丹,王海峰,等.杭州城西污水厂提标改造实践与思考[J].中国给水排水,2022,38(16):89.
YUJia-qing,WUDan-dan,WANGHai-feng,et al.Practice and Thinking on Upgrading of Hangzhou Chengxi WWTP[J].China Water & Wastewater,2022,38(4):89.
[3]张永森,夏文辉,董文博,等.MBBR+臭氧催化氧化用于工业区污水厂提标扩建[J].中国给水排水,2022,38(22):107.
ZHANGYong-sen,XIAWen-hui,DONGWen-bo,et al.Application of MBBR and Ozone Catalytic Oxidation in Upgrading and Expansion of an Industrial Park WWTP[J].China Water & Wastewater,2022,38(4):107.
[4]杨平,徐康康,周家中,等.MBBR+磁混凝用于A2/O微曝氧化沟污水厂提标扩容[J].中国给水排水,2023,39(10):67.
YANGPing,XUKang-kang,ZHOUJia-zhong,et al.Application of MBBR and Magnetic Coagulation Process in Upgrading and Expansion of a WWTP with A2/O Microporous Aeration Oxidation Ditch[J].China Water & Wastewater,2023,39(4):67.
[5]乔海兵,赵志太,李帅军,等.污水厂氧化沟改造为A2O+MBBR+O3工艺提标设计[J].中国给水排水,2023,39(22):60.
QIAOHai-bing,ZHAOZhi-tai,LIShuai-jun,et al.Design of Oxidation Ditch Upgraded to A2O, MBBR and O3 Process in a Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(4):60.