LIUYu-xue,LIPeng,WANGZheng.Study on the Distribution and Treatment of Typical Antibiotics in Wastewater Treatment Plants in China[J].China Water & Wastewater,2023,39(10):23-30.
我国污水处理厂中典型抗生素的分布及处理研究
- Title:
- Study on the Distribution and Treatment of Typical Antibiotics in Wastewater Treatment Plants in China
- 摘要:
- 根据我国已有的研究结果,综述了几类主要的抗生素在我国污水厂中的分布及去除途径,综合评价了污水处理厂中使用较为广泛的几种处理工艺在去除抗生素方面的差异。结果表明,经济发达地区对同一抗生素的去除效果要好于发展相对落后的地区,我国污水厂中氟喹诺酮类和磺胺类抗生素的检出率和检测浓度都很高,不同地区同一生物处理工艺对氟喹诺酮类抗生素都表现出较好的去除效果。污水处理厂的常规工艺对抗生素的去除率较低,单纯地采用某一种工艺很难对有机污染物进行降解,对于含有多种抗生素的污水处理厂来说,抗生素的存在降低了污水处理效果。生物处理工艺与膜处理法、高级氧化法联用是一种可行的抗生素处理方法,可以使抗生素去除率超过80%。
- Abstract:
- According to the existing research results, the distribution and removal paths of several main antibiotics in wastewater treatment plants in China were summarized, and several treatment processes widely used in wastewater treatment plants for antibiotic removal were comprehensively evaluated. The results showed that the removal effect of the same antibiotics in economically developed areas was better than that in relatively backward developed areas. The detection rate and the detected concentration of fluoroquinolones and sulfonamides in wastewater treatment plants in China are very high, and the same biological treatment process of the wastewater treatment plants in different areas shows good removal of fluoroquinolones. The removal rate of antibiotics by conventional treatment process in wastewater treatment plants is low, and it is difficult to degrade organic pollutants simply by a certain process. For wastewater containing various types of antibiotics, the presence of antibiotics reduces the removal effect of organic pollutants in wastewater treatment plants. The combination of biological treatment, membrane treatment and advanced oxidation is a feasible strategy for antibiotics treatment, which can make the removal rate of antibiotics more than 80%.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(10):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(10):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(10):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(10):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(10):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(10):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(10):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(10):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(10):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(10):81.