ZHUYi-xuan,WUZheng-qing,XUShi-rong,et al.Effect of Bio-clogging on Removal of Pollutants in Constructed Wetland[J].China Water & Wastewater,2023,39(11):69-74.
人工湿地生物堵塞对污染物去除效果的影响
- Title:
- Effect of Bio-clogging on Removal of Pollutants in Constructed Wetland
- 摘要:
- 为研究人工湿地运行过程中生物堵塞对其除污能力的影响,建立了垂直流人工湿地模型,采用连续运行的方式,研究了细(装置1)、中(装置2)、粗(装置3)3种不同粒径砾石填料装置的COD去除率随渗透系数k的变化规律,并以装置2为例,通过示踪实验考察生物堵塞过程中装置渗流水力特性的变化规律。结果表明,随着生物堵塞的发生,COD去除率随k的下降前期总体较为稳定,运行24 d后呈明显下降趋势,下降率分别达到18.2%、22.8%、22.9%。通过对比堵塞过程中各装置的累积去除负荷发现,若以k=0.5 cm/s为堵塞标准,装置3达到堵塞时的COD累积去除负荷最大,装置1最小。示踪实验结果表明,在生物堵塞初期,由于生物膜的积累使得流场分配更为均匀,真实水力停留时间变长,装置水力效率有所提升,这对装置的除污能力有利;而到运行后期,过量的生物堵塞物导致局部出现死水区,真实水力停留时间缩短,装置的水力效率明显下降,进而导致COD去除率下降。
- Abstract:
- To investigate the effect of bio-clogging on pollutants removal capacity of constructed wetland, three vertical flow constructed wetlands with fine (device 1), medium (device 2) and coarse (device 3) packing media was established and operated continuously to reveal the variation law of COD removal rate with permeability coefficient (k), and the seepage hydraulic characteristics of device 2 during bio-clogging was investigated by tracer experiment. With the occurrence of bio-clogging, the COD removal rate of the three devices was generally stable with the decrease of k in the early stage, and showed an obvious downward trend after 24 days of operation, in which the decreasing rates reached 18.2%, 22.8% and 22.9%, respectively. If k of 0.5 cm/s was selected as the clogging standard, the COD cumulative removal load in device 3 was the largest, while that of device 1 was the smallest. The tracer experiment results indicated that the accumulation of biofilm made the flow field more uniform and thus led to the prolong of actual hydraulic retention time (AHRT) and improvement of hydraulic efficiency in the early stage, which was beneficial to the pollutants removal. However, in the later stage, excessive bio-clogging led to local dead zone, shortened the AHRT, and significantly decreased the hydraulic efficiency of the device, leading to the decrease of COD removal rate.
相似文献/References:
[1]杜曼曼,张琼华,连斌,等.城市污水处理厂尾水人工湿地净化工程调试与运行[J].中国给水排水,2020,36(9):94.
[2]王晓云,蒋柱武,付爱民.UASB+两级人工湿地组合工艺处理农村污水[J].中国给水排水,2020,36(11):21.
[3]杜建强,杜滢明,张瑛,等.昆山珠泾中心河黑臭河道的系统施治设计与应用效果[J].中国给水排水,2020,36(12):129.
DU Jian-qiang,DU Ying-ming,ZHANG Ying,et al.Design and Application Effect of Systematic Treatment of Black and Odorous River in Zhujing Central River, Kunshan[J].China Water & Wastewater,2020,36(11):129.
[4]Jan Vymazal,卫婷,赵亚乾,等.细数植物在人工湿地污水处理中的作用[J].中国给水排水,2021,37(2):25.
Jan Vymazal,WEI Ting,ZHAO Ya-qian,et al.Counting the Roles of Plants in Constructed Wetlands for Wastewater Treatment[J].China Water & Wastewater,2021,37(11):25.
[5]邓敬轩,周润杰,单晓红,等.携菌新型生物质基材用于微污染水体治理[J].中国给水排水,2021,37(11):1.
DENG Jing-xuan,ZHOU Run-jie,SHAN Xiao-hong,et al.Biomass Substrate Carrying Bacteria for Treatment of Micro-polluted River Water[J].China Water & Wastewater,2021,37(11):1.
[6]管凛,陶梦妮,荆肇乾.人工湿地—微生物燃料电池强化尾水脱氮产电效能[J].中国给水排水,2021,37(13):7.
GUAN Lin,TAO Meng-ni,JING Zhao-qian.Enhanced Nitrogen Removal and Electricity Generation Efficiency of Constructed Wetland-Microbial Fuel Cells for Purification of Tail Water from Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(11):7.
[7]许青兰,孔令为,沈浙萍,等.浙江省档案局微污染景观水体生态修复工程实例[J].中国给水排水,2021,37(16):108.
XU Qing-lan,KONG Ling-wei,SHEN Zhe-ping,et al.Demonstration of Ecological Restoration Project for Micro-polluted Landscape Waters in Zhejiang Provincial Archives Bureau[J].China Water & Wastewater,2021,37(11):108.
[8]王晓云,付爱民,李启明.曝气氧化塘+人工湿地组合工艺处理农村污水[J].中国给水排水,2021,37(21):64.
WANG Xiao-yun,FU Ai-min,LEE King-ming.Combined Process of Aeration Pond and Constructed Wetland for Treatment of Rural Sewage[J].China Water & Wastewater,2021,37(11):64.
[9]肖海文,刘馨瞳,翟俊,等.人工湿地类型的选择及案例分析[J].中国给水排水,2021,37(22):11.
XIAO Hai-wen,LIU Xin-tong,ZHAI Jun,et al.Type Selection of Constructed Wetlands and Related Design Case Analysis[J].China Water & Wastewater,2021,37(11):11.
[10]姜春杰.改良Bardenpho+粉末活性炭+人工湿地处理生活污水[J].中国给水排水,2022,38(2):93.
JIANG Chun?jie.Application of Improved Bardenpho, PAC and Constructed Wetland Process in Sewage Treatment[J].China Water & Wastewater,2022,38(11):93.