GAIXin.Design of a Wastewater Treatment Plant Phase Ⅱ Upgrading and Expansion Project in Wuhu City[J].China Water & Wastewater,2023,39(14):80-84.
芜湖市某污水处理厂二期提标扩容工程设计
- Title:
- Design of a Wastewater Treatment Plant Phase Ⅱ Upgrading and Expansion Project in Wuhu City
- 关键词:
- 污水处理厂; 扩容提标; 改良Bardenpho
- 摘要:
- 芜湖市某污水处理厂现状(一期)规模10×104 m3/d,出水执行国家一级A排放标准。本次二期工程将污水厂总规模扩容至20×104 m3/d,出水水质提标至地表水准Ⅳ类标准。二期扩建采用改良Bardenpho生物反应池+磁混凝高效沉淀池+反硝化深床滤池工艺;对一期厂区现状多模式AAO反应池进行内部挖潜,投加悬浮填料,以强化硝化反硝化效果。实际运行表明,出水水质可稳定达标。本工程总投资39 737.47万元,新增单位经营成本1.47元/m3。
- Abstract:
- The current scale of a wastewater treatment plant in Wuhu City is 10×104 m3/d, and its effluent quality was required to meet the first level A limit specified in the discharge standard. In the phase Ⅱ project, the total scale of the wastewater treatment plant was expanded to 20×104 m3/d, and the effluent quality was upgraded to the quasi class Ⅳ limit specified in the surface water standard. The process consisting of modified Bardenpho biological reactor, magnetic coagulation high efficiency sedimentation tank and denitrification deep bed filter was adopted in the phase Ⅱ expansion project. The potential of the existing multi-mode AAO reactor in the phase Ⅰ project was tapped through adding suspended carriers, so as to enhance the nitrification and denitrification performance. Actual operation showed that the effluent quality met the discharge standard stably. The total investment of the project was 397.374 7 million yuan, and the unit operating cost was increased by 1.47 yuan/m3.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(14):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(14):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(14):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(14):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(14):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(14):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(14):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(14):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(14):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(14):81.