GEXue-wei,DENGWei-dong,YUNing.Optimal Design of Stormwater Regulation and Storage Pumping Station in Newly-built Concave Bridge Area[J].China Water & Wastewater,2023,39(14):91-95.
新建下凹桥区雨水调蓄泵站的优化设计
- Title:
- Optimal Design of Stormwater Regulation and Storage Pumping Station in Newly-built Concave Bridge Area
- Keywords:
- stormwater pumping station; initial runoff; co-constructed storage tank; concave bridge area
- 摘要:
- 新建道路下穿铁路、立体交叉道路时易成为积滞水点,下凹桥区雨水调蓄排放系统设计的合理性是确保下穿道路安全运行、避免内涝灾害的重要条件。在北京市锅炉厂南路雨水调蓄泵站设计中,结合下凹桥区的特点,在高排水防涝标准和黑臭水体治理的背景下,探讨了其防淹涝措施、雨水收集、狭小且不规则空间下的集约化布置、运行工况等内容,在用地紧张的城市核心区建设了集水泵强排、削减洪峰流量、径流污染控制等多功能于一体的雨水调蓄排放系统。实际汛期运行中状况良好,下凹桥区未出现积水,有效保障了道路运行安全。
- Abstract:
- Newly-built roads are likely to become stagnant water points when they pass through railways and three-dimensional crossing road. Therefore, the reasonable design of stormwater regulation, storage and discharge system in concave bridge area is important to ensure the safe operation of the concave bridge area and avoid waterlogging disaster. In the design of Guoluchangnan Road stormwater regulation and storage pumping station in Beijing, the waterlogging prevention measures, stormwater collection, intensive arrangement in small and irregular space and operation conditions were discussed under the background of strict drainage and flood control standard and black and smelly water body remediation in combination with the characteristics of the concave bridge area. A multi?functional stormwater storage and discharge system was built in a central urban district with tight land use, which integrated the functions such as pump drainage, reduction of flood peak flow and runoff pollution control. The actual operation of the system was in good condition in the flood season, and there was no water accumulation in the concave bridge area, which effectively ensured the safety of road operation.
相似文献/References:
[1]相洪旭,赵焕军,高尚坤,等.胶东国际机场下穿隧道雨水泵站设计探讨[J].中国给水排水,2018,34(20):63.
XIANG Hong xu,ZHAO Huan jun,GAO Shang kun,et al.Exploration on Design of Storm Water Pumping Station in Jiaodong International Airport Tunnel[J].China Water & Wastewater,2018,34(14):63.
[2]张青文,余健.初雨调蓄池布置方式对管道沉积物污染控制研究[J].中国给水排水,2022,38(19):114.
ZHANGQing-wen,YUJian.Effect of Initial Rainwater Storage Tank Layout on Control of Sewer Sediment Pollution[J].China Water & Wastewater,2022,38(14):114.
[3]杨磊三,李骏飞,李德强,等.广东某污水厂二期扩建污水和初期雨水处理工程设计[J].中国给水排水,2022,38(24):47.
YANGLei-san,LIJun-fei,LIDe-qiang,et al.Design of Phase-Ⅱ Expansion Project for Sewage and Initial Rainwater Treatment in a Wastewater Treatment Plant in Guangdong[J].China Water & Wastewater,2022,38(14):47.
[4]王震,江竹青,李悦,等.基于MIKE+水质模型的径流污染控制研究[J].中国给水排水,2024,40(3):124.
WANGZhen,JIANGZhu-qing,LIYue,et al.Control of Runoff Pollution Based on MIKE+ Stormwater Quality Model[J].China Water & Wastewater,2024,40(14):124.
[5]王康,李成江,李靖,等.基于HY-SWMM的大型雨水泵站优化设计[J].中国给水排水,2024,40(6):74.
WANGKang,LICheng-jiang,LIJing,et al.Optimization Design of Large Rainwater Pumping Station Based on HY-SWMM[J].China Water & Wastewater,2024,40(14):74.
[6]朱洁.用地受限条件下雨水泵站及调蓄池合建设计优化[J].中国给水排水,2024,40(14):73.
ZHUJie.Optimizing the Combined Construction Design of a Stormwater Pumping Station and Storage Tank within Limited Land Use Constraint[J].China Water & Wastewater,2024,40(14):73.
[7]孙怡强,李国然.雨水泵站水泵安装平台水流冲击力的分析计算[J].中国给水排水,2024,40(20):68.
SUNYi-qiang,LIGuo-ran.Analysis and Calculation of Water Flow Stress on Pump Installation Platform in Rainwater Pumping Station[J].China Water & Wastewater,2024,40(14):68.