LI Wen-qiu,WANGXiao-jie,XUYa-nan,et al.“BIM+” Integrated Technology for Reconstruction of Wastewater Treatment Plant Based on Bentley Secondary Development[J].China Water & Wastewater,2023,39(20):77-82.
基于Bentley二次开发的污水厂改造“BIM+”集成技术
- Title:
- “BIM+” Integrated Technology for Reconstruction of Wastewater Treatment Plant Based on Bentley Secondary Development
- Keywords:
- wastewater treatment plant; Bentley; BIM; secondary development
- 摘要:
- 李村河污水处理厂改造及四期扩建工程主要处理单元均采用全地下单层覆盖建设模式,存在隐蔽性强、管线错综复杂及工期紧等设计难点问题。采用建筑信息模型(BIM)技术进行辅助设计,通过Bentley平台二次开发,形成完善的图库及高效的污水厂建模工具库,弥补了原生平台的不足,提高了项目设计效率及设计质量,以自主开发编码工具为媒介,推动了“BIM+智慧平台”在该项目的应用,实现了资产高效运维,拓展了BIM技术的应用价值。
- Abstract:
- The main treatment units of Licunhe wastewater treatment plant reconstruction and phase Ⅳ expansion project all adopt the underground single-layer coverage construction mode. There are several difficult problems in the design of the project, such as strong concealment, complicated pipeline and short construction period. Building information modeling (BIM) technology was employed to assist the design. A complete drawing library and an efficient wastewater treatment plant modeling tool library were formed through the secondary development of Bentley platform, which made up for the deficiencies of the original platform and improved the design efficiency and quality of the project. With the self-developed coding tool as the medium, the application of “BIM+ intelligent platform” in this project realized the efficient operation and maintenance of assets and expanded the application value of BIM technology.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(20):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(20):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(20):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(20):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(20):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(20):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(20):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(20):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(20):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(20):81.