YINHua-sheng,CHENLei,LIUWen-ju,et al.Case Project of WWTP for Improving the Processing Capacity in Rainy Season to Control Overflow Pollution[J].China Water & Wastewater,2024,40(2):87-93.
污水处理厂提升雨季处理能力控制溢流污染案例
- Title:
- Case Project of WWTP for Improving the Processing Capacity in Rainy Season to Control Overflow Pollution
- Keywords:
- wastewater treatment plant; rainy season treatment capacity; overflow pollution; combined disinfection
- 摘要:
- 充分挖掘现有污水处理厂潜能,提高污水处理厂雨季处理能力,是解决城市排水系统溢流污染的重要途径。某污水处理厂采取增加生化池水深、提高生化池污泥浓度、在二沉池投加混凝剂以改善沉淀效果、次氯酸钠+紫外线联合消毒等措施,雨季平均日处理水量达到设计规模的1.54倍,最高日处理水量达到设计规模的1.87倍,出水水质稳定达标,有效削减了合流制排水系统的溢流污染。该项目实现雨季产能提升的改造投资为322.6万元,当处理水量超过设计规模后,新增污水处理量的运行成本仅为0.275 元/m3。
- Abstract:
- Fully exploiting the potential of existing wastewater treatment plant (WWTP) and improving its processing capacity in rainy season are important to solve the overflow pollution of urban drainage system. By taking measures such as increasing the water depth and the sludge concentration of biochemical tank, adding coagulants to the secondary sedimentation tank for improving sedimentation effect and adopting the disinfection of sodium hypochlorite combined with UV irradiation, the average daily processing capacity in rainy season of a WWTP can reach 1.54 times of the design scale, and the highest daily processing capacity can reach 1.87 times. The effluent quality can stably meet the standard, and the methods can effectively reduce the overflow pollution of the combined drainage system. The retrofit investment of this project to improve the productivity in rainy season is 3.226 million yuan. The operation cost of the extra treated wastewater is only 0.275 yuan/m3 when the treated wastewater exceeds the design scale.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(2):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(2):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(2):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(2):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(2):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(2):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(2):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(2):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(2):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(2):81.