WUJin-xie,CHENWei-hang,ZHOUHai-shan,et al.Engineering Design of the First Semi-underground Sewage Treatment Plant in Hangzhou[J].China Water & Wastewater,2024,40(18):53-58.
杭州市首座半地埋式污水处理厂工程设计
- Title:
- Engineering Design of the First Semi-underground Sewage Treatment Plant in Hangzhou
- Keywords:
- sewage treatment plant; semi-underground; ecological themed landscape park; nitrogen and phosphorus removal; denitrification deep bed filter
- 摘要:
- 杭州市七格污水处理厂四期工程规模为30×104 m3/d,针对城市土地资源愈发稀缺、居民对环境要求日益增高等问题,采用双层加盖的半地埋布置形式,顶部为生态主题景观公园。污水处理采用具有脱氮除磷功能的“A+AAO生物处理+反硝化深床滤池+紫外线消毒”工艺,出水水质稳定达到并优于一级A排放标准。该工程具有环境友好、土地集约、资源利用、工艺运行灵活等优点,是杭州市首座半地埋式污水处理厂,相比七格前三期地上式污水处理厂,其单位处理水量占地面积减少31%。
- Abstract:
- The Qige sewage treatment plant phase IV project in Hangzhou has a daily capacity of 30×104 m3/d. To address challenges such as the urban land scarcity and heightened environmental expectations from residents, the facility is designed as a double-storey semi-underground structure with a covered top storey featuring an ecological themed landscape park. The sewage treatment process includes an A+AAO biological tank, denitrification deep bed filter, ultraviolet disinfection, ensuring nitrogen and phosphorus removal. The treated effluent quality exceeds the grade A standard specified in the discharge regulations. The project offers several advantages including environmental friendliness, land intensification, resource utilization, and flexible process operation. It marks Hangzhou’s first semi-underground sewage treatment plant. Moreover, compared to the first three phases of the Qige sewage treatment plant aboveground, the area required per unit of treated sewage has been reduced by 31%.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(18):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(18):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(18):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(18):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(18):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(18):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(18):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(18):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(18):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(18):81.