- Title:
- Upgrading Engineering Design of Post-denitrification Filter and Activated Carbon Contact Tank
- Keywords:
- wastewater treatment plant; upgrading and reconstruction; advanced treatment; denitrification filter; activated carbon contact tank; high-efficiency magnetic coagulation tank; combined process
- 摘要:
- 河南省某污水处理厂规模为13×104 m3/d,出水将由执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准提高至《地表水环境质量标准》(GB 3838—2002)的准Ⅳ类标准。在更换老旧设备基础上,充分挖掘现有构筑物潜能,新建磁混凝高效池替代二期深度处理设施强化除磷,并增设反硝化滤池和活性炭接触池强化对有机物及TN的去除。因用地限制,新建构筑物集约叠合布置,以改善施工空间。通过构筑物组合运行,可有效应对工业废水引起的进水水质波动,确保出水水质稳定优于地表水准Ⅳ类标准。该提标改造工程与传统深度处理工艺相比,节约了电耗和药耗成本,解决了厂区用地紧张和抗冲击负荷能力差的难题。
- Abstract:
- The effluent quality of a wastewater treatment plant with capacity of 13×104 m3/d in Henan Province, will be raised from the first level A criteria in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) to the quasi-Ⅳ criteria in the Environmental Quality Standards for Surface Water (GB 3838-2002). Based on replacing the dilapidated equipment and excavating the potential of the existing system, a high-efficiency magnetic coagulation tank was built to replace the treatment facility of phase Ⅱ, and a denitrification filter and an activated carbon contact tank were installed to enhance the removal of organic matter and TN. Because of land use restrictions, new buildings are arranged intensively to improve the construction space. The operation of combined process can effectively cope with the fluctuation of influent quality caused by industrial wastewater and ensure the effluent quality stably superior to level quasi?Ⅳ standard of surface water. Comparing with the traditional advanced treatment process, the upgrading project saves the electricity consumption and chemical consumption cost, and solves the problems of land shortage and poor anti?impact load capacity of the plant.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(18):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(18):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(18):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(18):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(18):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(18):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(18):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(18):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(18):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(18):81.
[11]伍波,叶昌明,王小林,等.上向流反硝化深床滤池用于污水厂提标改造[J].中国给水排水,2022,38(4):103.
WUBo,YEChang-ming,WANGXiao-lin,et al.Application of Upflow DDBF in Upgrading and Reconstruction of a WWTP[J].China Water & Wastewater,2022,38(18):103.
[12]戴杨叶,张大鹏,伍林芳,等.某污水处理厂提标工程中的氧化沟改造实践[J].中国给水排水,2022,38(24):92.
DAIYang-ye,ZHANGDa-peng,WULin-fang,et al.Reconstruction Practice of Oxidation Ditch in a WWTP Upgrading Project[J].China Water & Wastewater,2022,38(18):92.
[13]杨淇椋,宋凤鸣,古伟,等.反硝化生物滤池+高效气浮工艺用于准Ⅳ类提标改造[J].中国给水排水,2023,39(12):125.
YANGQi-liang,SONGFeng-ming,GUWei,et al.Application of Denitrifying Biofilter and High-efficiency Air Floatation in Upgrading of a WWTP for Quasi-Ⅳ Standard[J].China Water & Wastewater,2023,39(18):125.