WANGLei,LUFeng,SUNXu-ping,et al.Energy Saving and Consumption Reduction Measures in A3O and MBR Domestic Sewage Treatment Plant[J].China Water & Wastewater,2024,40(20):83-88.
A3O+MBR工艺生活污水处理厂节能降耗措施
- Title:
- Energy Saving and Consumption Reduction Measures in A3O and MBR Domestic Sewage Treatment Plant
- Keywords:
- sewage treatment plant; MBR process; energy saving and consumption reduction; air blower replacement; submersible mixer; membrane replacement
- 摘要:
- MBR工艺能耗高是目前采用此工艺的城市污水处理厂面临的主要问题之一。为了实现节能降耗,昆山某污水处理厂采取了一系列优化措施,分别对空气系统、输送系统及混合系统高能耗设备开展了节能改造。结果显示,曝气风机改造重置后能耗下降0.08~0.09 kW·h/m3,膜擦洗风机置换后节省电量570 kW·h/d,潜水搅拌器改造重置后单位容积能耗最高下降12.28 W/m3,产水泵置换后实现节电量69 kW·h/d。膜置换后吨水电耗可下降0.029 kW·h/m3,节省电费约16.4万元/a(占全厂电费的6.27%),节省药剂费23.95万元/a,挽回水费损失57.8万元/a。
- Abstract:
- High energy consumption is one of the main problems faced by municipal sewage treatment plants using MBR process. In order to save energy and reduce consumption, a sewage treatment plant in Kunshan has taken a series of optimization measures, including energy saving technical reform for high energy consumption equipment of air system, conveying system and mixing system respectively. The results show that after technical transformation and replacement, energy consumption of the aeration blower decreased by 0.08-0.09 kW·h/m3, the electricity consumption of the membrane scrub fan was saved by 570 kW·h/d, the energy consumption per unit volume of the submersible mixer was reduced by 12.28 W/m3, and the electricity of the production water pump was saved by 69 kW·h/d. After membrane replacement, the power consumption can be reduced by 0.029 kW·h/m3, saving about 164 000 yuan per year of electricity which accounts for 6.27% of the whole plant’s electricity cost, saving 239 500 yuan per year of chemical and 578 000 yuan per year of water cost loss.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(20):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(20):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(20):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(20):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(20):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(20):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(20):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(20):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(20):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(20):81.