[1]韩小波,邹婷,王维康,等.基于原位扩容改造的AOA耦合MBBR工艺中试研究[J].中国给水排水,2025,41(5):1-7.
 HANXiao-bo,ZOUTing,WANGWei-kang,et al.Pilot Test of AOA Coupled MBBR Process Based on In-situ Capacity Expansion and Transformation[J].China Water & Wastewater,2025,41(5):1-7.
点击复制

基于原位扩容改造的AOA耦合MBBR工艺中试研究

相似文献/References:

[1]刘影,赖长清.悬浮填料耦合斜板沉淀改造MSBR的实践[J].中国给水排水,2024,40(6):108.
 LIUYing,LAIChang-qing.Renovation Practice of MSBR by Suspended Filler Coupled with Inclined Plate Sedimentation[J].China Water & Wastewater,2024,40(5):108.
[2]古凌艳,黄文章,王维康,等.AOA与多段AO工艺生物脱氮除磷性能的比较[J].中国给水排水,2024,40(7):1.
 GULing-yan,HUANGWen-zhang,WANGWei-kang,et al.Comparison on the Simultaneous Biological Nitrogen and Phosphorus Removal Performance between Pilot-scale Plant with AOA Process and Full-scale Plant with Mult-stage AO Process[J].China Water & Wastewater,2024,40(5):1.
[3]王洪刚,纪海霞,程树辉.哈尔滨市某污水处理厂提标改扩建工程设计[J].中国给水排水,2024,40(10):64.
 WANGHong-gang,JIHai-xia,CHENGShu-hui.Design of a Wastewater Treatment Plant Upgrading and Expansion Project in Harbin[J].China Water & Wastewater,2024,40(5):64.
[4]李志刚,韩文杰,杨忠启,等.四川某CASS污水厂连续流MBBR准Ⅳ类提标方案设计[J].中国给水排水,2025,41(2):52.
 LI Zhi-gang,HANWen-jie,YANGZhong-qi,et al.Scheme Design for Continuous Flow Class Ⅳ Standard Upgrading Using MBBR Process in a WWTP with CASS Process in Sichuan[J].China Water & Wastewater,2025,41(5):52.
[5]杨新慈,李军,周家中,等.生物膜和活性污泥用于污水高标准脱氮对比[J].中国给水排水,2025,41(2):95.
 YANGXin-ci,LIJun,ZHOUJia-zhong,et al.Comparison of Pure MBBR and Activated Sludge for High Standard Denitrification of Wastewater[J].China Water & Wastewater,2025,41(5):95.

更新日期/Last Update: 2025-03-01