[1]张璐.执行“江苏省地标”印染工业污水处理厂设计实例[J].中国给水排水,2025,41(6):95-101.
 ZHANGLu.Design Example of a Printing and Dyeing Industrial WWTP to Implement the Local Discharge Standard of Jiangsu Province[J].China Water & Wastewater,2025,41(6):95-101.
点击复制

执行“江苏省地标”印染工业污水处理厂设计实例

相似文献/References:

[1]赵健忠,王学华,王浩,等.浙江某印染废水处理工程改造及分析[J].中国给水排水,2020,36(14):134.
 ZHAO Jian-zhong,WANG Xue-hua,WANG Hao,et al.Reconstruction and Analysis of a Printing and Dyeing Wastewater Treatment Project in Zhejiang[J].China Water & Wastewater,2020,36(6):134.
[2]许晓明,刘宇心,闫萍,等.以工业废水为主的污水厂准Ⅳ类水质提标扩建工程设计[J].中国给水排水,2020,36(18):60.
 XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(6):60.
[3]尤鑫,万年红,雷培树,等.EBOTM升流式水解酸化池用于印染废水处理[J].中国给水排水,2021,37(10):138.
 YOU Xin,WAN Nian-hong,LEI Pei-shu,et al.Treatment of Printing and Dyeing Wastewater by EBOTM Up-flow Hydrolytic Acidification Tank[J].China Water & Wastewater,2021,37(6):138.
[4]丁静,张建良,任烨,等.混凝+A/O+气浮+臭氧+磁混凝工艺处理印染废水[J].中国给水排水,2021,37(20):112.
 DING Jing,ZHANG Jian-liang,REN Ye,et al.Treatment of Dyeing Wastewater by a Combined Process of Coagulation, A/O, Flotation, Ozone, and Magnetic Coagulation[J].China Water & Wastewater,2021,37(6):112.
[5]李志雷,张开海.芬顿预氧化+MBR工艺处理制药等化工废水[J].中国给水排水,2022,38(10):160.
 LIZhi-lei,ZHANGKai-hai.Treatment of Pharmaceutical Wastewater by Fenton Pre-oxidation and MBR Process[J].China Water & Wastewater,2022,38(6):160.
[6]薛罡,何月玲,王晓暖,等.印染废水的硫自养反硝化深度脱氮中试研究[J].中国给水排水,2022,38(13):15.
 XUEGang,HEYue-ling,WANGXiao-nuan,et al.Pilot Study of Sulfur-driven Autotrophic Denitrification for Advanced Nitrogen Removal in Secondary Effluent of Dyeing Wastewater[J].China Water & Wastewater,2022,38(6):15.
[7]楼洪海,楼朝刚,陈伟,等.立体集约式组合工艺用于印染废水处理及回用[J].中国给水排水,2024,40(2):115.
 LOUHong-hai,LOUChao-gang,CHENWei,et al.Application of Three-dimensional Intensive Combined Technology in the Treatment and Reuse of Printing and Dyeing Wastewater[J].China Water & Wastewater,2024,40(6):115.

更新日期/Last Update: 2025-03-17