ZHANGPeng-hui,LEIHai-dong,KONGHai-xia.Upgrading Case of a Textile Industrial Park WWTP in Shaanxi Province[J].China Water & Wastewater,2025,41(10):98-103.
陕西省某纺织工业园区污水处理厂提标改造工程实例
- Title:
- Upgrading Case of a Textile Industrial Park WWTP in Shaanxi Province
- Keywords:
- wastewater treatment; upgrading and reconstruction; BBR process; non-stop production renovation
- 摘要:
- 陕西省某纺织工业园区污水处理厂一期设计规模为4×104 m3/d,采用预处理+混合池+BBR装置+BBR曝气池+二沉池处理工艺。现状BBR曝气池停留时间较短,二沉池负荷偏高,且缺少深度处理工艺。在有限的用地条件下,为满足提标水质要求,本次提标改造扩建混合池、BBR曝气池及二沉池,新建磁混凝沉淀池及臭氧接触氧化池深度处理设施,同时改造加药间及鼓风机房,以保证各处理单元对污染物的有效去除。通过枯水期构筑物的池容调蓄、增加临时管道及控制阀门,实现了不停产改造。该项目建成后运行良好,出水水质稳定达到《陕西省黄河流域污水综合排放标准》(DB 61/224—2018)的A标准。
- Abstract:
- The first phase of the WWTP in a textile industrial park in Shaanxi Province has the capacity of 4×104 m3/d, adopting the process of pre-treatment, mixed tank, baffled bioreactor (BBR) device, BBR aeration tank, and secondary sedimentation tank. The BBR aeration tank had short retention time, the secondary sedimentation tank had high load, and there was a lack of advanced treatment process. In order to meet the water quality requirements for upgrading, under the condition of limited land, the mixed tank, BBR aeration tank, and secondary sedimentation tank are expanded. A new magnetic coagulation process, and an ozone contact oxidation tank for advanced treatment facilities are built. Meanwhile, the dosing room and the air blower room are renovated to ensure the effective removal of pollutants by each treatment unit. The non-stop production renovation is achieved through the regulation and storage of the tank capacity of the structures during the dry season, the addition of temporary pipelines and control valves. The project operates well after completion, and the effluent quality stably reaches level A criteria in the Integrated Wastewater Discharge Standard of Yellow River Basin in Shaanxi Province (DB 61/224-2018).
相似文献/References:
[1]张莹,王昌稳,李军,等.投加微粉强化低浓度生活污水活性污泥好氧颗粒化[J].中国给水排水,2018,34(21):12.
ZHANG Ying,WANG Chang wen,LI Jun,et al.Strengthening Aerobic Granulation of Activated Sludge by Adding Micro Powder in Low Concentration Sewage Treatment[J].China Water & Wastewater,2018,34(10):12.
[2]卢如,巨志剑,杜琼.采用A/O工艺的污水处理厂提标改造工程设计[J].中国给水排水,2018,34(20):56.
LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(10):56.
[3]王连杰,李金河,郑兴灿,等.城镇污水系统中病毒特性和规律相关研究分析[J].中国给水排水,2020,36(6):14.
[4]顾玉中,黄学军,金秋景,等.污水处理厂轴流泵电流爬升的原因及解决方法[J].中国给水排水,2020,36(10):119.
[5]王凯,高波,张磊,等.危废处置中心污水分质处理工艺设计及运行经验[J].中国给水排水,2020,36(16):69.
WANG Kai,GAO Bo,ZHANG Lei,et al.Experience in Design and Operation of Wastewater Separate Treatment in the Hazardous Waste Disposal Center[J].China Water & Wastewater,2020,36(10):69.
[6]李爽,王向阳,郝晓地,等.全生命周期评价在污水处理中的研究与应用[J].中国给水排水,2020,36(18):32.
LI Shuang,WANG Xiang-yang,HAO Xiao-di,et al.Research and Application of Life Cycle Assessment in Wastewater Treatment[J].China Water & Wastewater,2020,36(10):32.
[7]尹真真,赵丽,范围,等.城市生活污水厂处理工业废水的运营管理对策[J].中国给水排水,2020,36(24):54.
YIN Zhen-zhen,ZHAO Li,FAN Wei,et al.Suggestions on Operation and Management of Urban Domestic Sewage Treatment Plant Handled Industrial Wastewater[J].China Water & Wastewater,2020,36(10):54.
[8]Jan Vymazal,卫婷,赵亚乾,等.细数植物在人工湿地污水处理中的作用[J].中国给水排水,2021,37(2):25.
Jan Vymazal,WEI Ting,ZHAO Ya-qian,et al.Counting the Roles of Plants in Constructed Wetlands for Wastewater Treatment[J].China Water & Wastewater,2021,37(10):25.
[9]彭冠平,黄文海,刘军,等.武汉火神山、雷神山医院污水处理工程设计[J].中国给水排水,2021,37(2):42.
PENG Guan-ping,HUANG Wen-hai,LIU Jun,et al.Sewage Treatment Project Design of Wuhan Huoshenshan and Leishenshan Hospitals[J].China Water & Wastewater,2021,37(10):42.
[10]何家仪.香港沙头角污水厂扩建工程的智慧管理及信息化建设[J].中国给水排水,2021,37(2):72.
Carol HO Ka-yee.Smart Management and Digitalized Construction for Expansion Project of Sha Tau Kok Sewage Treatment Works in Hong Kong[J].China Water & Wastewater,2021,37(10):72.