XIXu-jun.Initial Rainwater Discharge Pollution and Storage Strategies for Strong Drainage Systems in High-density Built?up Areas[J].China Water & Wastewater,2025,41(12):41-46.
高密度建成区强排系统初雨放江污染与调蓄策略
- Title:
- Initial Rainwater Discharge Pollution and Storage Strategies for Strong Drainage Systems in High-density Built?up Areas
- Keywords:
- initial rainwater; strong drainage system; linear storage
- 摘要:
- 对初期雨水进行调蓄是当前建成区控制雨水泵站放江污染的主要方式。通过对上海浦东金桥区域多个雨水强排系统降雨量及雨水泵站放江水质的监测,综合分析了建成区分流制强排系统初期雨水污染来源及特征。针对高密度建成区特点,综合泵站分布、道路及河道布局、用地规划等因素,对比点状调蓄和线性调蓄后,采用在河道规划绿带下设置线性多系统联合调蓄管道的方案并进行效益分析。以2022年全年降雨情况进行模拟,工程建成后可实现降低泵站全年放江次数约48.62%,全年SS、COD、NH3-N及TP减排分别约33.18%、32.58%、31.77%、36.27%,具有较好的环境效益。该研究结果可为类似区域统筹控制初期雨水污染,建设集约化、更具韧性的初期雨水污染控制系统提供参考。
- Abstract:
- Regulating and storing initial rainwater has become the primary method for controlling pollution from rainwater pumping stations in the current built-up area. By monitoring rainfall across multiple rainwater drainage systems and the water quality of rainwater pumping stations in the Jinqiao area of Pudong, Shanghai, the sources and characteristics of initial rainwater pollution in the strong drainage system of the built-up area were comprehensively analyzed. Considering the characteristics of high-density built-up areas, combined with the distribution of pumping stations, road and river layout, land use planning and other factors, after comparing point shaped storage and linear storage, the scheme of setting up linear multi-system joint storage pipeline under the green belt of river planning is adopted and the benefit analysis is carried out. Based on the simulation of the annual rainfall in 2022, the project can reduce the number of discharges into the river by about 48.62%, and reduce the annual emissions of SS, COD, NH3-N, and TP by about 33.18%, 32.58%, 31.77%, and 36.27%, respectively, achieving environmental benefits. This approach provides a reference for similar areas to comprehensively control initial rainwater pollution and develop a intensive and more resilient initial rainwater pollution control system.
相似文献/References:
[1]徐晓明,杨国洪,刘楷操.清污分流渠在珠海市黑臭水体整治中的应用[J].中国给水排水,2020,36(10):113.
[2]赵也,汤钟,曾胜.基于模型评估的黑臭水体综合治理方案目标可达性分析[J].中国给水排水,2020,36(13):73.
ZHAO Ye,TANG Zhong,ZENG Sheng. Objective Reachability Analysis of Comprehensive Treatment Scheme of Black and Odorous Water Body Based on Model Evaluation [J].China Water & Wastewater,2020,36(12):73.
[3]史昊然.合流制溢流调蓄处理工艺效果评估及优化对策[J].中国给水排水,2021,37(5):106.
SHI Hao-ran.Performance Evaluation and Optimization Solutions of Combined Sewer Overflow Storage and Treatment Process[J].China Water & Wastewater,2021,37(12):106.
[4]曾木海,谢小龙.初雨调蓄池在武汉市某湖泊综合整治工程中的应用[J].中国给水排水,2021,37(12):93.
ZENG Mu-hai,XIE Xiao-long.Application of Initial Rainwater Storage Tank in a Lake Comprehensive Treatment Project in Wuhan[J].China Water & Wastewater,2021,37(12):93.
[5]周传庭,朱砂砾,杨殿海,等.初期雨水就地快速处理技术中试研究[J].中国给水排水,2022,38(19):108.
ZHOUChuan-ting,ZHUSha-li,YANGDian-hai,et al.Pilot Study on On-site Rapid Treatment Technology of Initial Rainwater[J].China Water & Wastewater,2022,38(12):108.
[6]钟江丽,沈捷,高华,等.基于DOM荧光光谱分析的初期雨水径流污染物溯源[J].中国给水排水,2023,39(7):133.
ZHONGJiang-li,SHEN Jie,GAOHua,et al.Source Tracing of Initial Rainwater Runoff Pollutants Based on DOM Fluorescence Spectrum Analysis[J].China Water & Wastewater,2023,39(12):133.
[7]侯文硕,周国华,葛铜岗,等.新型容积-流量型雨水弃流装置设计及效果评估[J].中国给水排水,2023,39(9):103.
HOUWen-shuo,ZHOUGuo-hua,GETong-gang,et al.Design and Effect Evaluation of a New Volume-Runoff Stormwater Diverting Device[J].China Water & Wastewater,2023,39(12):103.
[8]陈燕,黄瑾,蔡丽婧.适用于初雨截流的降雨-径流定量表达方法与设计雨型[J].中国给水排水,2025,41(4):49.
CHENYan,HUANGJin,CAILi-jing.Quantitative Expression Method of Rainfall-Runoff and Design Rain Pattern for Initial Rainwater Interception[J].China Water & Wastewater,2025,41(12):49.
[9]李宗强,郭函君,束敏.大口径初雨调蓄管道工程设计[J].中国给水排水,2025,41(10):46.
LIZong-qiang,GUOHan-jun,SHUMin.Design of Large-diameter Initial Rainwater Storage Pipelines[J].China Water & Wastewater,2025,41(12):46.