[1]王晓男.水库取水顶管无接收井水下取机头施工关键技术[J].中国给水排水,2025,41(12):90-96.
 WANGXiao-nan.Key Technology for Underwater Head Pipe Jacking Machine Construction without a Receiving Well at the Water Intake of the Reservoir[J].China Water & Wastewater,2025,41(12):90-96.
点击复制

水库取水顶管无接收井水下取机头施工关键技术

相似文献/References:

[1]王美凤,渠元闯,沈振锁,等.DN3 000钢管顶管用于引水工程检修应急通道[J].中国给水排水,2023,39(4):108.
 WANGMei-feng,QUYuan-chuang,SHENZhen-suo,et al.Application of DN3 000 Steel Pipe Jacking in Emergency Access of Zhaoshandu Water Diversion Project[J].China Water & Wastewater,2023,39(12):108.
[2]杨睿,曾德星,崔旭辉.大直径穿湖顶管回退施工关键技术研究[J].中国给水排水,2024,40(6):126.
 YANGRui,ZENG De-xing,CUIXu-hui.Research on Key Techniques for Backward Construction of Large Diameter Pipe Jacking under a Lake[J].China Water & Wastewater,2024,40(12):126.
[3]沈青松,陈烨,叶盛华,等.长距离注浆顶管顶力规范公式的取值研究及分析[J].中国给水排水,2024,40(20):63.
 SHENQing-song,CHENYe,YESheng-hua,et al.Research and Analysis on the Standard Formula Value for the Jacking Force of Long?distance Grouting Pipes[J].China Water & Wastewater,2024,40(12):63.

更新日期/Last Update: 2025-06-17