CHENGTian-shi,QIYao-le,DONGPeng-hui,et al.Operational Optimization Practice of Sewage Lifting Pump Unit Based on Sequential Controll Principle[J].China Water & Wastewater,2025,41(22):111-116.
基于时序控制原理的污水提升泵组运行优化实践
- Title:
- Operational Optimization Practice of Sewage Lifting Pump Unit Based on Sequential Controll Principle
- Keywords:
- sewage treatment plant; sequential control; sewage lifting pump unit; operational optimization; energy conservation and consumption reduction
- 摘要:
- 针对某城市污水处理厂进水泵房液位波动大、动力提升能耗高等问题,通过优化污水提升泵组的水量调节范围,基于历史运行数据和参数率定合理设置时序控制边界条件,有效降低泵组运行能耗。在此基础上,将时序控制逻辑接入自动控制系统,有效减少了人工干预。结果表明,实施优化措施后泵组的平均电耗为0.047 kW·h/m3,较实施前平均电耗(0.054 kW·h/m3)同比下降12.96%,处于最佳液位区间的时段由实施前的54.47%提升至86.31%。此外,采用时序控制后能够更好地适应阶梯电价政策,有利于可持续发展。
- Abstract:
- There are some problems in the inlet pump room of a municipal sewage treatment plant, such as large fluctuation of water level and high energy consumption. Based on historical operating data and parameter calibration, this study significantly reduces the energy consumption of the pump unit by optimizing the water volume adjustment range of the lifting pump unit and setting reasonable sequential control boundary conditions. On this basis, the sequential control logic was integrated into the automatic control system, effectively reducing manual intervention. The results showed that after the implementation of optimization measures, the average electricity consumption of the pump unit was reduced to 0.047 kW·h/m3, a year-on-year decrease of 12.96% compared to the average electricity consumption of 0.054 kW·h/m3 before implementation. The period in the optimal liquid level range increased from 54.47% before implementation to 86.31%. In addition, the sequential control can better adapt to the tiered electricity pricing policy and achieve sustainable development.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(22):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(22):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(22):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(22):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(22):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(22):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(22):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(22):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(22):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(22):81.