[1]李宏斌,刘保成,李昌兵,等.杭州某城镇污水处理厂五段式Bardenpho工艺调试运行[J].中国给水排水,2020,36(12):150-154.
 LI Hong-bin,LIU Bao-cheng,LI Chang-bing,et al.Commissioning and Operation of Five-stage Bardenpho Process in a Municipal Sewage Treatment Plant in Hangzhou[J].China Water & Wastewater,2020,36(12):150-154.
点击复制

杭州某城镇污水处理厂五段式Bardenpho工艺调试运行

相似文献/References:

[1]董姗燕,陈刚,池春榕,等.厌氧环境对UNITANK工艺性能的影响[J].中国给水排水,2018,34(21):74.
 DONG Shan yan,CHEN Gang,CHI Chun rong,et al.Effect of Anaerobic Environment on Performance of UNITANK Process[J].China Water & Wastewater,2018,34(12):74.
[2]李磊,王社平.低温条件下微孔曝气氧化沟中试装置的调试及启动[J].中国给水排水,2020,36(7):7.
[3]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[4]肖炘圻,陈鑫,周伟,等.喀斯特地区乡镇污水一体化处理技术效果分析[J].中国给水排水,2020,36(9):12.
[5]陈江杰,贺雷蕾,刘锐,等.A2O设施处理长三角平原地区农村生活污水的效果[J].中国给水排水,2020,36(9):75.
[6]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
 WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(12):111.
[7]聂健锋,曾超.三峡库区Carrousel氧化沟工艺提标升级改造设计[J].中国给水排水,2020,36(18):66.
 NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(12):66.
[8]柴晓利,韩红波,张宏亮,等.HPB工艺用于污水厂提标扩容改造的生产性试验研究[J].中国给水排水,2021,37(1):9.
 CHAI Xiao-li,HAN Hong-bo,ZHANG Hong-liang,et al.Full-scale Test of HPB Process Applied in Upgrading and Capacity Expansion of a Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(12):9.
[9]夏雯菁.大型机场污水处理改造工程实例[J].中国给水排水,2021,37(4):110.
 XIA Wen-jing.Example of a Wastewater Treatment Reconstruction Project in a Large Airport[J].China Water & Wastewater,2021,37(12):110.
[10]茹春,张爽,路晖,等.低温条件下污水处理厂的除污效果及运行调控分析[J].中国给水排水,2021,37(9):1.
 RU Chun,ZHANG Shuang,LU Hui,et al.Pollutants Removal Performance and Operation Regulation of Urban Wastewater Treatment Plant under Low Temperature Condition[J].China Water & Wastewater,2021,37(12):1.

更新日期/Last Update: 2020-06-17