我国城市排水系统现状、问题与发展建议
- Title:
- Current Status, Problems and Development Suggestions of Urban Drainage System in China
- Keywords:
-
color: rgb(102; 102; 102); text-transform: none; text-indent: 0px; letter-spacing: normal; font-style: normal; font-variant: normal; font-weight: 400; text-decoration: none; word-spacing: 0px; white-space: normal; orphans: 2; -webkit-text-stroke-width: 0px; font-family: Arial; Verdana; sans-serif; font-size: 12pt; ">
102
; 102); line-height: 150%; font-family: tahoma; arial; helvetica; sans-serif; font-size: 12px; "> pipe network problem; drainage system; wastewater treatment facility; water environment treatment; wastewater discharge
- 摘要:
-
随着城市化、工业化速度的加快,我国城市污水排放量逐年增长,污水处理设施规模逐年增大,但城市水环境治理依然存在问题。通过分析2002年—2016年我国城市污水处理设施的发展与现状,发现我国污水处理设施的基础建设已经基本完成,污水排放量与末端处理设施能力的矛盾已得到缓解且污水处理设施留有余量,污水处理设施的建设由阶梯式的快速增长模式转变为随着城市人口变化与城市建设而变化的可持续发展模式。而城市水环境污染治理的主要 方向已经转变为解决管网 问题与水环境治理现状之间的矛盾,管网规模不足、混接问题严重、地下水入渗、合流制溢流、调蓄建设不足是未来排水系统应该解决的主要问题。
- Abstract:
-
With the acceleration of urbanization and industrialization, the discharge of municipal wastewater and the scale of wastewater treatment facilities in China have been increasing year by year.However, there are still problems in urban water environment management. By analyzing the development and current situation of municipal wastewater treatment facilities in China from 2002 to 2016, the infrastructure of wastewater treatment facilities have been basically completed, the contradiction between the end treatment infrastructure capacity and wastewater dischange has been alleviated, and the wastewater treatment facilities have left the remaining treatment capacity, so the construction of wastewater treatment facilities has changed from a stepped rapid growth model to a sustainable development model dominated by urban population change and urban construction. At the present stage, the main direction of urban water environmental pollution treatment has been transformed into solving the contradiction between the problems of pipe network and the current situation of water environment treatment. Insufficient length of pipe network, serious problem of misconnection of pipe network, infiltration of groundwater in pipe network, overflow of combined flow and construction of storage facilities are the main problems, which should be solved in future drainage system.
相似文献/References:
[1]孙永利,张维,郑兴灿,等.城镇居民人均日生活污水污染物产生量测算之产污规律[J].中国给水排水,2020,36(6):1.
[2]范荣桂,刘娜,尹利鹏,等.污泥厌氧催化快速发酵产VFAs的试验研究[J].中国给水排水,2020,36(11):69.
[3]镇祥华,余琴芳,万年红,等.污水处理厂二级出水深床滤池超深度脱氮研究[J].中国给水排水,2020,36(11):91.
[4]赵美玲,朱涛,冯江,等.水力模型在合流制调蓄池进水管改造中的应用[J].中国给水排水,2020,36(7):114.
[5]朱一文,王文亮.基于水文方法的暴雨调节塘规模计算[J].中国给水排水,2020,36(7):118.
[6]李骏飞,李欢,杨磊三.粤港澳大湾区创新治水模式分享[J].中国给水排水,2020,36(8):1.
[7]李激,王燕,熊红松,等.城镇污水处理厂消毒设施运行调研与优化策略[J].中国给水排水,2020,36(8):7.
[8]赵锡锋,李兴强,李军.好氧颗粒污泥技术中试研究及应用进展[J].中国给水排水,2020,36(8):30.
[9]王建西.PTA2O工艺用于养猪废水处理及其Anammox现象分析[J].中国给水排水,2020,36(8):56.
[10]高海英,邓磊,侯晓庆,等.MBR工艺在西安经开草滩污水处理厂中的应用[J].中国给水排水,2020,36(8):63.
[11]莫俊锋,王文亮,白献宇,等.基于设计暴雨法的CSO调蓄池池容计算方法探讨[J].中国给水排水,2020,36(8):77.
[12]郭健.纳入大直径热力管的综合管廊设计研究[J].中国给水排水,2020,36(8):82.
[13]蒙政成,冼萍,黄付平,等.NCMBR工艺在工业园区污水处理工程中的应用[J].中国给水排水,2020,36(8):88.