ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):64-68.
阳泉市污水处理二期工程BARDENPHO工艺设计和运行
- Title:
- Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant
- 关键词:
- 污水处理厂; BARDENPHO工艺; 滤布滤池
- Keywords:
- wastewater treatment plant; BARDENPHO process; cloth filter
- 摘要:
- 阳泉市污水处理二期工程建设规模为8×104 m3/d,出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)一级A标准和《地表水环境质量标准》(GB 3838—2002)Ⅴ类水质标准中的较严值。该项目采用抗冲击负荷能力强、脱氮除磷功能强的BARDENPHO生物处理工艺,工艺流程为BARDENPHO生物处理+混合反应沉淀+滤布滤池+消毒,污泥处理采用机械脱水工艺。生物处理采用多点布水、多点回流措施,将污水分别配入预缺氧区和厌氧区,污泥回流到预缺氧区与一定比例的进水混合,大大增强了脱氮除磷能力。该项目于2017年投产运行,出水水质稳定达到设计标准。
- Abstract:
- The capacity of phase Ⅱ project of Yangquan wastewater treatment plant was 80 000 m3/d. The effluent quality implements the strict value of the first level A standard of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002)and class Ⅴ water quality standard of Environmental Quality Standards for Surface Water (GB 3838-2002). The project adopts the BARDENPHO biological treatment process with strong shock load resistance and strong nitrogen and phosphorus removal function. The process flow is BARDENPHO biological treatment+mixed reaction sedimentation tank+cloth filter+disinfection, and the sludge treatment adopts mechanical dewatering process. The biological treatment adopts multi-point water distribution and multi-point reflux measures. The sewage is divided into pre-anoxic zone and anaerobic zone respectively. The sludge returns to the pre-anoxic zone and mixes with a certain proportion of influent water, which greatly enhances the ability of nitrogen and phosphorus removal. The project was put into operation in 2017, and the effluent quality stably reached the design standard.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(16):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(16):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):13.
[4]刘强,王泰,沈浡,等.MBBR工艺用于污水厂提标改造的低温运行效果[J].中国给水排水,2020,36(13):7.
LIU Qiang,WANG Tai,SHEN Bo,et al. Operation Effect of MBBR Applied in Upgrading and Reconstruction of a Wastewater Treatment Plant in Tianjin at Low Temperature [J].China Water & Wastewater,2020,36(16):7.
[5]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(16):23.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(16):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(16):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(16):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(16):81.