[1]车爱伟,胡坤,李龙伟,等.孟加拉国大型供水工程设计实例[J].中国给水排水,2020,36(16):74-80.
CHE Ai-wei,HU Kun,LI Long-wei,et al.Design Case of Large-scale Water Supply Project in Bangladesh[J].China Water & Wastewater,2020,36(16):74-80.
点击复制
CHE Ai-wei,HU Kun,LI Long-wei,et al.Design Case of Large-scale Water Supply Project in Bangladesh[J].China Water & Wastewater,2020,36(16):74-80.
孟加拉国大型供水工程设计实例
中国给水排水[ISSN:1000-4062/CN:12-1073/TU]
卷:
第36卷
期数:
2020年第16期
页码:
74-80
栏目:
出版日期:
2020-08-17
- Title:
- Design Case of Large-scale Water Supply Project in Bangladesh
- Keywords:
- Bangladesh; water supply project; Chinese standards
- 摘要:
- 孟加拉国Padma(帕德玛)供水工程建设内容包括1座47.25×104 m3/d取水泵站、1座45×104 m3/d净水厂、1座加压泵站和32.5 km DN2 000压力输水管线,涵盖了取水、净水、加压、输水工程,是一个给水系统工程。工程设计采用中国标准,应用水力模型、Surge水锤模拟、复合地基处理、BIM设计等科学方法辅助优化设计, 力争将该工程打造成国际一流的海外精品工程,推行中国标准走向海外。设计中对取水位置选择、取水方式、净水厂工艺选择、水锤分析、顶管施工、加压泵站规模、因地制宜设计等重点难点问题进行了系统分析,以期为海内外大型供水工程提供设计经验。
- Abstract:
- A 47.25×104 m3/d water intake pumping station, a 45×104 m3/d water treatment plant, a booster pumping station and 32.5 km DN2 000 pressure water pipeline were constructed in Padma water supply project in Bangladesh, which was a project covering water intake, water purification, pressure and water conveyance. The design adopted Chinese standards, and scientific methods such as hydraulic models, Surge water hammer simulation, composited foundation treatment, and BIM design were used to assist optimal design. The original intention of the design was to strive to build the project into an international first-class overseas fine quality project and promoted Chinese standards to go overseas. In the design, the key and difficult problems, such as water intake location selection, water intake mode, water purification plant process selection, water hammer analysis, pipe jacking construction, pressurized pump station scale, local design and so on, were systematically analyzed in order to provide design experience for large-scale water supply projects at home and abroad.
相似文献/References:
[1]胡坤,李龙伟,车爱伟,等.孟加拉国PADMA水厂取水工程设计[J].中国给水排水,2022,38(2):73.
HU Kun,LI Long?wei,CHE Ai?wei,et al.Design of Water Intake Project for PADMA Water Plant in Bangladesh[J].China Water & Wastewater,2022,38(16):73.
更新日期/Last Update:
2020-08-17