WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(16):111-115.
MSBR工艺在高排放标准污水处理厂的应用
- Title:
- Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard
- 关键词:
- 10单元MSBR工艺; 污水处理厂; 高排放标准; 脱氮除磷
- Keywords:
- ten-unit MSBR process; wastewater treatment plant; stringent discharge standard; nitrogen and phosphorus removal
- 摘要:
- 某高排放标准污水处理厂生化处理采用10单元MSBR工艺,主要介绍了10单元MSBR工艺原理、工艺设计、调试过程及实际运行情况。运行结果表明,新型10单元MSBR工艺出水主要指标达到《地表水环境质量标准》(GB 3838—2002)准Ⅳ类水质(TN≤10 mg/L)指标限值,具有占地面积小、进水碳源利用率高、脱氮除磷效果好等优点,是一种可用于高排放标准污水处理厂的先进生化工艺方案。
- Abstract:
- The process principle, design, commissioning and actual operation effect of a ten-unit MSBR process for biochemical treatment in a wastewater treatment plant with stringent discharge standard were discussed. The results showed that the major effluent quality indicators (TN≤10 mg/L) reached level quasi Ⅳ criteria in Environmental Quality Standards for Surface Water (GB 3838-2002) and the process had the advantages of small footprint, high utilization rate of influent carbon source, high removal efficiency of nitrogen and phosphorus. Thus, the designed process could be used as an advanced biochemical treatment process for wastewater treatment plant with stringent discharge standard.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(16):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(16):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(16):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101.
[7]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(16):23.
[8]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(16):56.
[9]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(16):81.
[10]张莉,余国富,瞿露,等.重庆市某污水处理厂一级A提标改造运行效果分析[J].中国给水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(16):95.