YAO Tong,YU Hua-dong,ZHENG Yuan-wu,et al.Pilot-scale Test on First Grade A Upgrading and Reconstruction of a Wastewater Treatment Plant in a Chemical Industrial Park in Ninbo City[J].China Water & Wastewater,2020,36(19):72-76.
宁波某化工园区污水厂一级A升级改造工艺中试
- Title:
- Pilot-scale Test on First Grade A Upgrading and Reconstruction of a Wastewater Treatment Plant in a Chemical Industrial Park in Ninbo City
- 摘要:
- 为了使出水COD和TN满足《城镇污水处理厂污染物排放标准》(GB 18918—2002)中一级A标准要求,宁波某化工园区污水厂升级改造项目拟采用反硝化生物滤池+臭氧催化氧化组合工艺。为了优化工艺参数,进行了规模为0.1~0.3 m3/h的中试。反硝化生物滤池工艺中试结果表明,当滤速为2~4 m/h、C/N比值为5~6时,对TN的去除率可达85%以上。臭氧催化氧化工艺中试结果表明,当臭氧投加量为65 mg/L、气液比为1.5 ∶1时,对COD的去除效果最好,可将进水COD由117 mg/L稳定降至40 mg/L以下。组合工艺连续运行结果表明,出水COD可稳定在40 mg/L以下、TN可稳定在5 mg/L以下,达到一级A排放标准。
- Abstract:
- In order to make COD and TN in the effluent meeting first grade A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002), a wastewater treatment plant in a chemical industrial park in Ningbo City was upgraded by using a combined process of denitrification biofilter and ozone catalytic oxidation. The pilot-scale test with treatment capacity of 0.1-0.3 m3/h was carried out to optimize the operational parameters. When filtration velocity was 2-4 m/h and C/N ratio was 5-6, the removal efficiency of TN in the denitrification biofilter could reach more than 85%. When dosage of ozone was 65 mg/L, and gas-liquid ratio was 1.5 ∶1, COD removal efficiency of the ozone catalytic oxidation process was the best, which could be stably decreased from 117 mg/L to less than 40 mg/L. COD and TN in the effluent of the combined process were always no more than 40 mg/L and 5 mg/L, respectively, which all met the first grade A discharge standard.
相似文献/References:
[1]高伟楠.高出水标准下的再生水厂COD深度处理工艺比选[J].中国给水排水,2020,36(10):58.
[2]杨清,郭淑琴,陈伟楠.准Ⅳ类出水标准下天津咸阳路污水处理厂的迁建提标设计[J].中国给水排水,2021,37(12):88.
YANG Qing,GUO Shu-qin,CHEN Wei-nan.Design of Relocation of Tianjin Xianyanglu Sewage Treatment Plant Upgraded to Quasi-Ⅳ Standard[J].China Water & Wastewater,2021,37(19):88.
[3]杨洪新,马文静,姜雪松,等.臭氧催化氧化工艺设备优化中试研究[J].中国给水排水,2021,37(21):89.
YANG Hong-xin,MA Wen-jing,JIANG Xue-song,et al.Pilot Study on Optimization of Ozone Catalytic Oxidation Process and Its Equipment[J].China Water & Wastewater,2021,37(19):89.
[4]苏三宝,尚红超,李春红,等.臭氧催化氧化/BAF深度处理高含硫气田采出水[J].中国给水排水,2023,39(17):106.
SUSan-bao,SHANGHong-chao,LIChun-hong,et al.Catalytic Ozonation/Biological Aerated Filter Combined Process for Advanced Treatment of Effluent from High Sour Gas Field[J].China Water & Wastewater,2023,39(19):106.
[5]于华芹,石伟,徐会君,等.Co-Mn/γ-Al2O3催化剂的制备及其催化性能[J].中国给水排水,2023,39(17):113.
YUHua-qin,SHIWei,XUHui-jun,et al.Preparation of Co-Mn/γ-Al2O3 Composite Catalyst and Its Catalytic Performance[J].China Water & Wastewater,2023,39(19):113.
[6]彭锦玉,李振邦,张坤乾,等.前置臭氧-生物流化床工艺用于水厂提质改造[J].中国给水排水,2024,40(12):94.
PENGJin-yu,LIZhen-bang,ZHANGKun-qian,et al.Application of Pre-ozone and Biological Fluidized Bed in Updating and Transformation of Waterworks[J].China Water & Wastewater,2024,40(19):94.