[1]史昊然.合流制溢流调蓄处理工艺效果评估及优化对策[J].中国给水排水,2021,37(5):106-110.
 SHI Hao-ran.Performance Evaluation and Optimization Solutions of Combined Sewer Overflow Storage and Treatment Process[J].China Water & Wastewater,2021,37(5):106-110.
点击复制

合流制溢流调蓄处理工艺效果评估及优化对策

相似文献/References:

[1]赵泽坤,车伍,赵杨,等.美国合流制溢流污染控制灰绿设施结合的经验[J].中国给水排水,2018,34(20):36.
 ZHAO Ze kun,CHE Wu,ZHAO Yang,et al.Experiences of Combination of Gray-Green Infrastructure for Combined Sewer Overflow Control in the United States[J].China Water & Wastewater,2018,34(5):36.
[2]莫俊锋,王文亮,白献宇,等.基于设计暴雨法的CSO调蓄池池容计算方法探讨[J].中国给水排水,2020,36(8):77.
[3]韩靖博,杨默远,潘兴瑶,等.合流制排水分区海绵城市多层级调控效果定量评估[J].中国给水排水,2020,36(19):95.
 HAN Jing-bo,YANG Mo-yuan,PAN Xing-yao,et al.Quantitative Evaluation of Multi-level Regulation Effect of Sponge City in Combined Drainage Zone[J].China Water & Wastewater,2020,36(5):95.
[4]常胜昆,周丹,马洪涛,等.厦门浯溪黑臭水体合流制溢流污染控制技术[J].中国给水排水,2021,37(6):1.
 CHANG Sheng-kun,ZHOU Dan,MA Hong-tao,et al.Technical Research on CSO Pollution Control of Black and Odorous Water Body of Wuxi River in Xiamen[J].China Water & Wastewater,2021,37(5):1.
[5]邹安平.合流制溢流污染调蓄池设计容积数值模拟[J].中国给水排水,2022,38(5):116.
 ZOUAn-ping.Numerical Simulation of Design Volume of Combined Sewer Overflow Storage Tank[J].China Water & Wastewater,2022,38(5):116.
[6]张磊,杨卫国,王浩正,等.辅助设计CSO调蓄池的动态模拟工具[J].中国给水排水,2022,38(18):6.
 ZHANGLei,YANGWei-guo,WANGHao-zheng,et al.A Dynamic Simulation Tool for Aided Design of CSO Storage Tanks[J].China Water & Wastewater,2022,38(5):6.
[7]尹华升,柳畅,谭觉,等.《湖南省排水系统溢流污染控制技术导则》解读[J].中国给水排水,2024,40(16):18.
 YINHua-sheng,LIUChang,TANJue,et al.Explanation of Technical Guideline for Overflow Pollution Control of Sewer System in Hunan Province[J].China Water & Wastewater,2024,40(5):18.
[8]陈梅娟,李伟英,朱晓媛,等.北京市龙潭西湖流域合流制溢流污染调蓄系统设计[J].中国给水排水,2024,40(18):71.
 CHENMei-juan,LIWei-ying,ZHUXiao-yuan,et al.Design of Regulation and Storage System for Combined Overflow Pollution Control in the Longtanxi Lake Area of Beijing[J].China Water & Wastewater,2024,40(5):71.

更新日期/Last Update: 2021-03-01