- Application of MBBR Process in an Upgrading and Reconstruction Project of a Sewage Treatment Plant in Nanchang
- Keywords:
- upgrading and reconstruction; first level A standard; MBBR
- 摘要:
- 南昌市某污水处理厂处理规模为20×104 m3/d,采用卡鲁塞尔氧化沟工艺,出水水质执行《城镇污水处理厂污染物排放标准》(GB 18918—2002)一级B标准,需提标至一级A标准。为解决现状生物池缺氧区停留时间不足和好氧区硝化不彻底的问题,改造工程采用强化生物处理和增设深度处理工艺的措施,即氧化沟MBBR改造+高效混凝沉淀+回转式过滤+次氯酸钠消毒提标改造工艺。实际运行表明,处理效果较好,出水水质稳定优于设计值。提标改造工程设计总投资2.08亿元,污水处理总成本及经营成本分别为0.651、0.497元/m3。
- Abstract:
- Treatment capacity of a sewage treatment plant in Nanchang is 20×104 m3/d, and the main process is Carrousel oxidation ditch. The original effluent quality needs to reach the national first level B discharge standard, and now it requires to upgrade to first level A limitation of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002). In order to solve the problem of short residence time in anoxic zone and incomplete nitrification in aerobic zone, measures of enhanced biological treatment and adding advanced treatment technology were adopted in the upgrading project, that was oxidation ditch modified by MBBR process, high efficiency coagulation sedimentation, rotary filtration and sodium hypochlorite disinfection. Actual operation showed the treatment performance was good, and the effluent quality was stable and better than the design value. The total investment of the upgrading project was about 208 million yuan, and the total unit cost and operational cost were 0.651 yuan/m3 and 0.497 yuan/m3, respectively.
相似文献/References:
[1]熊建英.MBBR+磁混凝工艺用于污水处理厂提标改造[J].中国给水排水,2018,34(20):50.
XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(14):50.
[2]卢如,巨志剑,杜琼.采用A/O工艺的污水处理厂提标改造工程设计[J].中国给水排水,2018,34(20):56.
LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(14):56.
[3]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[4]张晶晶,杨翠春,丁鹏霖,等.MBBR工艺用于唐山某污水厂提标改造效能分析[J].中国给水排水,2020,36(15):78.
ZHANG Jing-jing,YANG Cui-chun,DING Peng-lin,et al.Efficiency Analysis of MBBR Process Applied in Upgradation of a Wastewater Treatment Plant in Tangshan[J].China Water & Wastewater,2020,36(14):78.
[5]许晓明,刘宇心,闫萍,等.以工业废水为主的污水厂准Ⅳ类水质提标扩建工程设计[J].中国给水排水,2020,36(18):60.
XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(14):60.
[6]聂健锋,曾超.三峡库区Carrousel氧化沟工艺提标升级改造设计[J].中国给水排水,2020,36(18):66.
NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(14):66.
[7]张莉,余国富,瞿露,等.重庆市某污水处理厂一级A提标改造运行效果分析[J].中国给水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(14):95.
[8]马丽芳,陈菊香,孙锐.克拉玛依市某污水处理厂一级A提标改造工程实例[J].中国给水排水,2020,36(18):122.
MA Li-fang,CHEN Ju-xiang,SUN Rui.A WWTP Upgrading Reconstruction Project to Meet the First Level A Discharge Standard in Karamay[J].China Water & Wastewater,2020,36(14):122.
[9]孙高升,王东东,弋凡,等.淮河流域地表水类Ⅳ类标准污水深度处理工艺研究[J].中国给水排水,2020,36(19):16.
SUN Gao-sheng,WANG Dong-dong,YI Fan,et al.Advanced Wastewater Treatment Process with Effluent Quality Meeting Level Quasi Ⅳ Criteria of Surface Water in Huai River Basin[J].China Water & Wastewater,2020,36(14):16.
[10]李亮,邱宏俊.改良A2/O氧化沟强化生化处理技术用于污水厂提标改造[J].中国给水排水,2020,36(20):124.
LI Liang,QIU Hong-jun.Application of Improved A2/O Oxidation Ditch Enhanced Biochemical Treatment Process for Upgrading the Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(14):124.