WENG Xian-ming,ZHU Shuang,XIE Ming-hua,et al.Exploration for Wenzhou Nanpian Sewage Treatment Plant Upgrading to Clean Discharge Standard of Zhejiang Province[J].China Water & Wastewater,2021,37(16):13-18.
温州市南片污水厂提标至浙江省清洁排放标准的探索
- Title:
- Exploration for Wenzhou Nanpian Sewage Treatment Plant Upgrading to Clean Discharge Standard of Zhejiang Province
- 关键词:
- 浙江清洁排放标准; 污水处理厂; 提标改造; “设计+采购+施工”总承包
- Keywords:
- clean discharge standard of Zhejiang Province; sewage treatment plant; upgrading and reconstruction; EPC
- 摘要:
- 以温州市南片污水厂为例,介绍了污水厂出水达到浙江省清洁排放标准的提标改造设计方案。通过在原有工艺基础上进行分流,1.5×104 m3/d的分流污水采用“改良Bardenpho+二沉池+高密度沉淀池”工艺,而后与2.5×104 m3/d原工艺出水合并进行4×104 m3/d 污水的“反硝化深床滤池+臭氧接触氧化+消毒”的深度处理。该工程采用由设计单位牵头的联合体总承包模式实施,有利于发挥设计龙头作用,整合优势资源,与施工单位互为裨益,保障工程顺利实施。
- Abstract:
- Taking Wenzhou Nanpian sewage treatment plant as an example, this work introduces the upgrading and reconstruction program, which aims to meet the clean discharge standard of Zhejiang Province. The 1.5×104 m3/d of sewage from the original sewage treatment plant is introduced to bio-chemical treatment tank equipped with improved Bardenpho process, secondary clarification and highsludge sedimentation. And then, converged the original process effluent(2.5×104 m3/d), the advanced treatment processes, including denitrifying deep-bed filtration, ozone oxidation treatment and disinfection are used to upgrade the quality for the total sewage flow (4×104 m3/d). The EPC mode led by design institute is applied to this project, which is more conducive for the design institute to play a leading role. The design institute and the construction company can work together to ensure the implementation of the project.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(16):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(16):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(16):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(16):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(16):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(16):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(16):81.