[1]李银波,王广华,周建华.改良AAO+双层沉淀池在半地埋污水处理厂的应用[J].中国给水排水,2021,37(22):54-58.
 LI Yin-bo,WANG Guang-hua,ZHOU Jian-hua.Application of Modified AAO Process and Double-deck Sedimentation Tank in a Semi-buried Sewage Treatment Plant[J].China Water & Wastewater,2021,37(22):54-58.
点击复制

改良AAO+双层沉淀池在半地埋污水处理厂的应用

相似文献/References:

[1]陈宝玉,杨涛,刘东征,等.武汉北湖污水处理厂设计关键节点分析及组合流程的应用[J].中国给水排水,2020,36(24):92.
 CHEN Bao-yu,YANG Tao,LIU Dong-zheng,et al.Essential Analysis of Design Key Node and Application of Combined Process in Beihu Wastewater Treatment Plant in Wuhan[J].China Water & Wastewater,2020,36(22):92.
[2]陈永玲.小型地表水厂集约化工艺设计[J].中国给水排水,2021,37(6):96.
 CHEN Yong-ling.Intensive Process Design of Small Surface Water Plant[J].China Water & Wastewater,2021,37(22):96.
[3]唐章程,杨坤,贾建伟,等.广东某污水厂二期工程集约化设计[J].中国给水排水,2024,40(2):60.
 TANGZhang-cheng,YANGKun,JIAJian-wei,et al.Intensive Design of the Phase Ⅱ Project of a Sewage Treatment Plant in Guangdong[J].China Water & Wastewater,2024,40(22):60.

更新日期/Last Update: 2021-11-17