SHENG Jun,ZHANG Shuai-ling.Enlightenment of Sludge Incineration Project Commissioning Experience on Design Optimization[J].China Water & Wastewater,2021,37(24):113-118.
污泥焚烧工程调试经验对设计优化的启示
- Title:
- Enlightenment of Sludge Incineration Project Commissioning Experience on Design Optimization
- 摘要:
- 以上海市石洞口污泥处理二期工程为例,通过分析工程调试经验,探讨污泥焚烧工程的设计优化措施。为应对入炉污泥热值及含水率波动,稳定焚烧炉运行工况,可调整半干污泥及脱水污泥的入炉量配比,并在炉前污泥接收设施中增加均质功能。为进一步提高工程运行的灵活度和稳定性,降低生产线逻辑控制难度,可在干化和焚烧环节之间设置集中的半干污泥储存设施。污泥输送系统应尽可能简化输送环节,输送设备的能力余量不宜过大,且需考虑炉前干湿泥返混后污泥性状改变的工况。
- Abstract:
- This paper discusses the design optimization measures of the sludge incineration project by analyzing the commissioning experience based on the second phase project of Shanghai Shidongkou sludge treatment plant. The ratio between semi-dry sludge and dewatered sludge can be adjusted according to the fluctuations of sludge calorific value and moisture content, and a homogenizing function can be added in the sludge receiving facility before furnace, so as to stabilize the operation conditions of the incinerator. A centralized storage facility for semi-dry sludge can be set up between drying and incineration processes to improve the flexibility and stability of project operation, also reduce the difficulty of logical control for the production line. The sludge conveying system should be simplified as much as possible. The capacity allowance of the sludge conveying system should not be too large. Moreover, it is necessary to consider the working condition caused by sludge property change after the backmixing of dry and wet sludge before furnace.
相似文献/References:
[1]袁雅姝,陈正洋,傅金祥,等.地下水源除铁锰滤池调试运行实践及思考[J].中国给水排水,2020,36(15):35.
YUAN Ya-shu,CHEN Zheng-yang,FU Jin-xiang,et al.Practice and Consideration of Commissioning and Operation of Iron and Manganese Removal Filter Treating Groundwater in Liaozhong District of Shenyang City[J].China Water & Wastewater,2020,36(24):35.
[2]黄炜琉,黄麒玮,廖东,等.南宁水塘江水质净化厂曝气生物滤池工艺调试与运行[J].中国给水排水,2021,37(4):92.
HUANG Wei-liu,HUANG Qi-wei,LIAO Dong,et al.Commissioning and Operation of EBAF in Nanning Shuitangjiang Sewage Treatment Plant[J].China Water & Wastewater,2021,37(24):92.
[3]刘勇.城市生活污泥干化焚烧工程调试与试运行[J].中国给水排水,2021,37(6):117.
LIU Yong.Commissioning and Trial Operation of a Municipal Sludge Drying and Incineration Project[J].China Water & Wastewater,2021,37(24):117.
[4]张晏晏.利用仪表监测数据判断生物活性炭系统调试工况[J].中国给水排水,2023,39(14):128.
ZHANGYan-yan.Commissioning Conditions of BAC System Judged by Instrument Monitoring Data[J].China Water & Wastewater,2023,39(24):128.