FENGShi-xun,ZHANGWan-li,CHENGMing-tao,et al.Design of a Wastewater Treatment Plant Upgrading and Reconstruction Process in the First-grade Protection Zone of Taihu Lake Basin[J].China Water & Wastewater,2022,38(6):76-80.
太湖流域一级保护区内某污水厂提标改造工艺设计
- Title:
- Design of a Wastewater Treatment Plant Upgrading and Reconstruction Process in the First-grade Protection Zone of Taihu Lake Basin
- Keywords:
- Taihu Lake basin; upgrading and reconstruction; denitrification biofilter; high speed flotation tank
- 摘要:
- 对太湖流域一级保护区内某污水处理厂按照《太湖地区城镇污水处理厂及重点工业行业主要水污染物排放限值》(DB 32/1072—2018)标准提标改造,设计规模5.0×104 m3/d。针对出水标准高、现状主体构筑物去除能力有限、现状厂区没有有效的深度处理设施等工程问题,保留原一期CAST工艺、二期A2/O工艺,新建反硝化生物滤池、高速气浮池深度处理设施,并采取强化源头控制、提高污泥浓度、增加泥龄、控制溶解氧、优化碳源投加位置等非工程性管控措施。提标后工艺流程为粗格栅及进水泵房+细格栅及旋流沉砂池+CAST池(一期)/组合式A2/O池(二期)+反硝化生物滤池+高速气浮池+接触消毒池,出水水质稳定达到设计标准。工程总投资9 550.46 万元,增加总处理费用0.98 元/m3。
- Abstract:
- A wastewater treatment plant with a designed scale of 5.0×104 m3/d in the first?grade protection zone of Taihu Lake basin was upgraded according to the discharge limitation specified in Discharge Standard of Main Water Pollutants for Municipal Wastewater Treatment Plant & Key Industries of Taihu Area (DB 32/1072-2018). There are several engineering problems such as high effluent standard, limited removal capacity of current main structures, and no effective advanced treatment facilities in the current plant. To overcome these problems, the original CAST process in phase Ⅰ project and A2/O process in phase Ⅱ project were retained, a new denitrification biofilter and a high speed flotation tank as the advanced treatment facilities were constructed, and non-project measures, such as strengthening source control, increasing sludge concentration and sludge age, controlling dissolved oxygen and optimizing carbon source dosage point were adopted. After the transformation, the new process consists of coarse grid and inlet pump house, fine grid and cyclone settling tank, CAST tank (phase Ⅰ)/combined A2/O tank (phase Ⅱ), denitrification biofilter, high speed flotation tank and contact disinfection tank, and the effluent quality reaches the design standard stably. The total investment of the project is 95.504 6 million yuan, and the total treatment cost is increased by 0.98 yuan/m3.
相似文献/References:
[1]周子翀,杨旭,肖融,等.应对高藻原水的水厂多点加氯技术原理与应用[J].中国给水排水,2021,37(12):109.
ZHOU Zi-chong,YANG Xu,XIAO Rong,et al.Technical Principle and Application of Multi-point Chlorination in High Algae Water Treatment[J].China Water & Wastewater,2021,37(6):109.
[2]姜鸣,石芳永,顾雪峰,等.工业园区污水厂准Ⅳ类水质提标改造工程设计[J].中国给水排水,2022,38(2):59.
JIANG Ming,SHI Fang?yong,GU Xue?feng,et al.Design of a Wastewater Treatment Plant Upgrading Project in an Industry Park to Meet Quasi?Ⅳ Surface Water Standard[J].China Water & Wastewater,2022,38(6):59.
[3]伍波,叶昌明,王小林,等.上向流反硝化深床滤池用于污水厂提标改造[J].中国给水排水,2022,38(4):103.
WUBo,YEChang-ming,WANGXiao-lin,et al.Application of Upflow DDBF in Upgrading and Reconstruction of a WWTP[J].China Water & Wastewater,2022,38(6):103.
[4]常尧枫,谢嘉玮,谢军祥,等.城镇污水处理厂提标改造技术研究进展[J].中国给水排水,2022,38(6):20.
CHANGYao-feng,XIEJia-wei,XIEJun-xiang,et al.Research Progress on Upgrading and Reconstruction Technology of Urban Sewage Treatment Plants[J].China Water & Wastewater,2022,38(6):20.
[5]王建利,陈霖,魏寿廷,等.基于南方典型水质的奥贝尔氧化沟升级改造[J].中国给水排水,2022,38(16):96.
WANGJian-li,CHENLin,WEIShou-ting,et al.Upgrading of Orbal Oxidation Ditch Based on Typical Southern China Wastewater Characteristics[J].China Water & Wastewater,2022,38(6):96.
[6]周国标,吕银忠,郑望,等.工业园区污水厂出水提至地表水Ⅴ类标准改造工程[J].中国给水排水,2022,38(18):87.
ZHOUGuo-biao,LüYin-zhong,ZHENG Wang,et al.Retrofitting Project of an Industrial Park WWTP to Meet Level Ⅴ Surface Water Standard[J].China Water & Wastewater,2022,38(6):87.
[7]肖海文,覃文翊,翟俊,等.微藻光生物反应器在养猪废水处理提标改造中的应用[J].中国给水排水,2022,38(19):23.
XIAOHai-wen,QINWen-yi,ZHAIJun,et al.Application of Microalgae Photobioreactor in Upgrading and Reconstruction of Piggery Wastewater Treatment Process[J].China Water & Wastewater,2022,38(6):23.
[8]张方方,刘骁智,张波.A2O+MBR+臭氧催化氧化用于化工园区污水厂升级改造[J].中国给水排水,2022,38(20):61.
ZHANGFang-fang,LIUXiao-zhi,ZHANGBo.Application of A2O/MBR/Catalytic Ozonation in Upgrading and Reconstruction of Wastewater Treatment Plant in Chemical Industrial Park[J].China Water & Wastewater,2022,38(6):61.
[9]贾莉,傅妍芳,龚淑芬.化工园区污水处理一级A提标改造工艺及运行分析[J].中国给水排水,2022,38(20):124.
JIALi,FUYan-fang,GONGShu-fen.Analysis on First Level A Criteria Upgrading Process and Operation of Wastewater Treatment in a Chemical Industrial Park[J].China Water & Wastewater,2022,38(6):124.
[10]郭葵香,余俊.活性焦吸附过滤技术用于造纸废水处理提标改造[J].中国给水排水,2022,38(22):111.
GUOKui-xiang,YUJun.Application of Active Coke Adsorption Filtration Technology in Upgrading Papermaking Wastewater Treatment[J].China Water & Wastewater,2022,38(6):111.
[11]冯仕训,张万里,蒋岚岚.太湖流域8座污水处理厂新地标提标改造设计总结[J].中国给水排水,2023,39(8):61.
FENGShi-xun,ZHANGWan-li,JIANG Lan-lan.Summary of Upgrading and Reconstruction Design of Eight Wastewater Treatment Plants to Meet New Local Discharge Standard in Taihu Lake Basin[J].China Water & Wastewater,2023,39(6):61.