YUJia-qing,WUDan-dan,WANGHai-feng,et al.Practice and Thinking on Upgrading of Hangzhou Chengxi WWTP[J].China Water & Wastewater,2022,38(16):89-95.
杭州城西污水厂提标改造实践与思考
- Title:
- Practice and Thinking on Upgrading of Hangzhou Chengxi WWTP
- 摘要:
- 杭州城西污水处理厂按照浙江省《城镇污水处理厂主要水污染物排放标准》(DB 33/2169—2018)进行技术改造,将原一期生物池AAO处理工艺改造成Bardenpho+MBBR工艺,同时增加了低温带式干化污泥深度处理设施。改造完成后出水水质稳定达到设计标准,干化出泥含水率可降至30%左右,但也出现了MBBR填料偶发性堵塞、干化车间臭气浓度高、产泥量提升难度大等问题,值得同类污水厂升级改造时注意。
- Abstract:
- Hangzhou Chengxi wastewater treatment plant was reconstructed technically in accordance with the Discharge Standard of Major Water Pollutants for Municipal Wastewater Treatment Plant (DB 33/2169-2018) in Zhejiang Province. The original biological tank AAO treatment process in phase I is transformed into Bardenpho and MBBR process, and the advanced treatment facilities of low temperature belt drying sludge are added. After the transformation, the effluent can reach the design standard stably, and the water content of dried sludge can be reduced to about 30%. However, there are also some problems, such as the occasional blockage of MBBR filler, high odor concentration in drying workshop and difficulty to improve sludge production, which can provide reference for the upgrading and reconstruction of similar WWTPs.
相似文献/References:
[1]熊建英.MBBR+磁混凝工艺用于污水处理厂提标改造[J].中国给水排水,2018,34(20):50.
XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):50.
[2]卢如,巨志剑,杜琼.采用A/O工艺的污水处理厂提标改造工程设计[J].中国给水排水,2018,34(20):56.
LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(16):56.
[3]周亚梁,黄东月.南方某污水处理厂提标改造工艺运行优化[J].中国给水排水,2020,36(8):113.
[4]许晓明,刘宇心,闫萍,等.以工业废水为主的污水厂准Ⅳ类水质提标扩建工程设计[J].中国给水排水,2020,36(18):60.
XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(16):60.
[5]聂健锋,曾超.三峡库区Carrousel氧化沟工艺提标升级改造设计[J].中国给水排水,2020,36(18):66.
NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(16):66.
[6]张莉,余国富,瞿露,等.重庆市某污水处理厂一级A提标改造运行效果分析[J].中国给水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(16):95.
[7]马丽芳,陈菊香,孙锐.克拉玛依市某污水处理厂一级A提标改造工程实例[J].中国给水排水,2020,36(18):122.
MA Li-fang,CHEN Ju-xiang,SUN Rui.A WWTP Upgrading Reconstruction Project to Meet the First Level A Discharge Standard in Karamay[J].China Water & Wastewater,2020,36(16):122.
[8]孙高升,王东东,弋凡,等.淮河流域地表水类Ⅳ类标准污水深度处理工艺研究[J].中国给水排水,2020,36(19):16.
SUN Gao-sheng,WANG Dong-dong,YI Fan,et al.Advanced Wastewater Treatment Process with Effluent Quality Meeting Level Quasi Ⅳ Criteria of Surface Water in Huai River Basin[J].China Water & Wastewater,2020,36(16):16.
[9]李亮,邱宏俊.改良A2/O氧化沟强化生化处理技术用于污水厂提标改造[J].中国给水排水,2020,36(20):124.
LI Liang,QIU Hong-jun.Application of Improved A2/O Oxidation Ditch Enhanced Biochemical Treatment Process for Upgrading the Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):124.
[10]黄志心.城镇污水处理厂提标改造实践与思考[J].中国给水排水,2020,36(22):48.
HUANG Zhi-xin.Practice and Thinking of Upgrading and Reconstruction of Municipal Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):48.