[1]周建忠,胡晓,王麒麟,等.多段多级AO工艺用于全地下式陡沟河污水处理厂二厂[J].中国给水排水,2022,38(20):48-54.
 ZHOUJian-zhong,HUXiao,WANGQi-lin,et al.Application of Multi-stage AO Process in Dougouhe No.2 Underground Wastewater Treatment Plant[J].China Water & Wastewater,2022,38(20):48-54.
点击复制

多段多级AO工艺用于全地下式陡沟河污水处理厂二厂

相似文献/References:

[1]郑玢,杨涛,何帅.全地下式污水处理厂地下箱体室内消火栓设计探讨[J].中国给水排水,2023,39(18):84.
 ZHENGBin,YANGTao,HEShuai.Discussion on the Design of Indoor Fire Hydrant in Underground Structural Box of Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(20):84.
[2]杜立刚,石亚军,吴志高,等.全地下式污水处理厂站防淹方法及应用实例[J].中国给水排水,2024,40(20):59.
 DULi-gang,SHIYa-jun,WUZhi-gao,et al.Flood Prevention Design Method and Application Case of Underground Sewage Treatment Plant (Station)[J].China Water & Wastewater,2024,40(20):59.

更新日期/Last Update: 2022-10-17