FEIRong-xin,XIANGLi,HUANGChou,et al.Adsorption Removal of Phosphate in Wastewater by Metal-containing Salt Sludge Recovered from WWTP[J].China Water & Wastewater,2022,38(23):1-6.
污水处理厂金属盐泥资源化回收及其吸附除磷性能
- Title:
- Adsorption Removal of Phosphate in Wastewater by Metal-containing Salt Sludge Recovered from WWTP
- Keywords:
- wastewater treatment plant; metal-containing salt sludge; phosphate removal; resource utilization
- 摘要:
- 从污水处理厂末端气浮池回收原始金属盐泥,考察了其对水中磷酸盐的吸附性能,以及吸附剂投加量、再生液pH等因素对吸附性能的影响。结果表明,当盐泥投加量为0.3 g/L时,其释放的磷酸盐浓度也仅为(0.04±0.01) mg/L,远低于城镇污水处理厂一级A排放标准,更远低于城镇污水处理厂一般进水浓度(4~7 mg/L)。随着原始盐泥投加量的增大,对水中磷酸盐的去除率提高。当盐泥投加量为0.5 g/L时,对浓度为1 mg/L的含磷溶液去除率高达89.4%,且吸附过程更符合准二级动力学(R2=0.99)。原始盐泥对生化池进水和气浮池进水中的磷酸盐(分别为2.32、0.52 mg/L)均具有良好的去除效果,去除率分别为(54.5±1.4)% 和(26.2±0.8)%,表现出优异的除磷应用潜力。再生液pH显著影响吸附性能,且再生后的金属盐泥(pH=10处理)对磷酸盐的吸附去除率达到87.0%,显著高于原始盐泥(79.6%)。
- Abstract:
- This paper discussed the phosphate removal ability of the original metal-containing salt sludge recovered from the flotation tank of the wastewater treatment plant (WWTP), and further investigated the effects of the adsorbent dosage, the regeneration solution pH and other factors on the adsorption performance. When the dosage of salt sludge was set as 0.3 g/L, the phosphate released by the adsorbent was also only (0.04±0.01) mg/L, which was much lower than grade Ⅰ-A discharge standard of pollutants for municipal wastewater treatment plant and concentration of influent from WWTP (4-7 mg/L). With the increase of the original salt sludge dosage, the P-removal rate was also improved. When the dosage of salt sludge was set as 0.5 g/L, the removal rate of P-containing solution (1 mg/L) was as high as 89.4%, and the phosphate adsorption process by salt sludge could better be described by pseudo-second-order kinetics model (R2=0.99). The raw salt sludge had a good phosphate removal efficiency of (54.5±1.4)% and (26.2±0.8)% on the influent of biochemical tank (2.32 mg/L) and floatation tank (0.52 mg/L), exhibiting an excellent practical application potential for phosphate removal of real wastewater. The pH of regeneration solution significantly affected the adsorption performance,and when the pH was adjusted as 10, the phosphate adsorption efficiency of the regenerated salt sludge reached 87.0%, much higher than 79.6% of the raw salt sludge.
相似文献/References:
[1]周亚梁,郭俊希,谢势导,等.珠海某接收工业废水污水处理厂工艺调控措施[J].中国给水排水,2024,40(22):131.
ZHOUYa-liang,GUOJun-xi,XIEShi-dao,et al.Process Control Measures of a Sewage Treatment Plant Receiving Industrial Wastewater in Zhuhai[J].China Water & Wastewater,2024,40(23):131.
[2]盖鑫.芜湖市某污水处理厂二期提标扩容工程设计[J].中国给水排水,2023,39(14):80.
GAIXin.Design of a Wastewater Treatment Plant Phase Ⅱ Upgrading and Expansion Project in Wuhu City[J].China Water & Wastewater,2023,39(23):80.
[3]高绪涛,田津.污水处理厂多模式生物反应池的设计应用分析[J].中国给水排水,2023,39(14):124.
GAOXu-tao,TIANJin.Design and Application Analysis of Multi-mode Biological Reaction Tank in a WWTP[J].China Water & Wastewater,2023,39(23):124.
[4]夏沛青.改良AAO+微絮凝工艺用于高集约半地下式污水厂[J].中国给水排水,2023,39(16):83.
XIAPei-qing.Application of Modified AAO and Micro-flocculation Process in Highly Intensive Semi-underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(23):83.
[5]王保贵,蔺洪永,刘玉婷,等.污水处理厂积砂情况分析与防治对策[J].中国给水排水,2023,39(18):107.
WANGBao-gui,LINHong-yong,LIUYu-ting,et al.Analysis of Grit Sediment in a Sewage Treatment Plant and the Prevention Countermeasures[J].China Water & Wastewater,2023,39(23):107.
[6]冀鹏宙,袁进,杨志宏,等.前置预缺氧A2/O+AO工艺全流程测试与应用研究[J].中国给水排水,2023,39(18):112.
JIPeng-zhou,YUANJin,YANGZhi-hong,et al.Whole Process Testing and Application of Pre-anoxic A2/O and AO Process[J].China Water & Wastewater,2023,39(23):112.
[7]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(23):13.
[8]赵剑强,张局,史冰峰,等.剩余污泥衰减系数取值范围探讨[J].中国给水排水,2022,38(24):53.
ZHAOJian-qiang,ZHANGJu,SHIBing-feng,et al.Discussion on the Value Range of Excess Sludge Decay Coefficient[J].China Water & Wastewater,2022,38(23):53.
[9]戴杨叶,张大鹏,伍林芳,等.某污水处理厂提标工程中的氧化沟改造实践[J].中国给水排水,2022,38(24):92.
DAIYang-ye,ZHANGDa-peng,WULin-fang,et al.Reconstruction Practice of Oxidation Ditch in a WWTP Upgrading Project[J].China Water & Wastewater,2022,38(23):92.
[10]罗景阳,张乐,张腾,等.不同工艺对污水处理效能及细菌代谢功能的影响[J].中国给水排水,2021,37(23):61.
LUO Jing-yang,ZHANG Le,ZHANG Teng,et al.Effects of Different Processes on Wastewater Treatment Efficiency and Bacterial Metabolic Function[J].China Water & Wastewater,2021,37(23):61.