DAIYang-ye,ZHANGDa-peng,WULin-fang,et al.Reconstruction Practice of Oxidation Ditch in a WWTP Upgrading Project[J].China Water & Wastewater,2022,38(24):92-96.
某污水处理厂提标工程中的氧化沟改造实践
- Title:
- Reconstruction Practice of Oxidation Ditch in a WWTP Upgrading Project
- Keywords:
- wastewater treatment plant; oxidation ditch; upgrading and reconstruction; denitrification
- 摘要:
- 某污水处理厂采用Carrousel氧化沟工艺,处理规模为5×104 m3/d。因廊道较长,无独立的缺氧区,设备损坏率较高,出水总氮长期不能达标。为使出水水质满足《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准,决定在最大程度地保留利用已建构筑物的基础上进行提标改造。通过结构及设备改造,将氧化沟功能区进行重新划分,改造成AAO氧化沟工艺。实施改造后,氧化沟运行效果良好,管理方便,电耗下降约34.1%,节约电费约90万元/a。
- Abstract:
- The treatment capability of Carrousel oxidation ditch process in a wastewater treatment plant (WWTP) is 5×104 m3/d. Since the corridor is long and there are no independent anoxic zones, the damage rate of the equipment is relatively high, and the effluent total nitrogen could not meet the standard for a long time. It is determined to upgrade and reconstruct the process on the basis of the maximum reservation and utilization of the existing structures, so as to meet the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). Through the transformation of equipment and structures, the functional area of oxidation ditch was transformed into the AAO oxidation ditch process. After the transformation, not only has the oxidation ditch good operation effect and convenient management, but also the power consumption decreased by about 34.1%, which saves about 900 thousand yuan per year.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(24):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(24):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(24):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(24):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(24):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(24):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(24):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(24):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(24):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(24):81.