GAOYan-bo,YANGZhong-qi,ZHOUJia-zhong,et al.Application of BFM Fabricated Structure in the Design of Land Limited Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(2):46-51.
BFM装配式用于占地受限型污水处理工程设计
- Title:
- Application of BFM Fabricated Structure in the Design of Land Limited Wastewater Treatment Plant
- Keywords:
- MBBR; magnetic coagulation; fabricated structure; high standard; land occupation; rapid construction; BFM; combined sewer overflows
- 摘要:
- 北方某污水处理厂新建处理规模为1×104 m3/d的污水处理设施,要求出水水质达到地表水准V类标准。采用BFM装配式进行施工建设,仅用时29 d就完成污水处理设施建设并实现通水运行,通水7 d后实现达标排放,解决了项目面临的占地受限、实施周期短、稳定性要求高等难题。项目实施完成后单位占地仅为0.142 m2/(m3·d-1)。实际运行效果显示,BFM出水水质稳定并优于设计标准,通过纯膜MBBR后缺氧区碳源调控,可保障BFM出水TN低于5 mg/L。BFM装配式具有集约紧凑、高效稳定、经济快速的优势,为污水厂提标扩容提供了新思路。
- Abstract:
- A new treatment facility with a treatment capacity of 1×104 m3/d has built in a wastewater treatment plant in north China, and the effluent quality is required to meet the surface water quasi class V standard. It only took 29 days to complete the construction of wastewater treatment facilities and realized wastewater treatment by using BFM fabricated structure. After 7 days of operation, the effluent quality reached the discharge standard, which solved the problems such as limited footprint area, short construction time and high stability requirements. After the completion of the project, the unit occupied area was only 0.142 m2/(m3·d-1). The effluent quality was stable and better than the design standard. The TN in effluent from BFM was guaranteed to be lower than 5 mg/L through the regulation of carbon source in post-anoxic zone of pure MBBR. BFM fabricated structure has the advantages of intensive, compact, efficient, stable, economic and time-saving, which provides a new idea for the upgrading and expansion of wastewater treatment plant.
相似文献/References:
[1]朱点钰,陈年浩,朱津苇,等.填料类型对MBBR启动及运行效能的影响[J].中国给水排水,2018,34(21):1.
ZHU Dian yu,CHEN Nian hao,ZHU Jin wei,et al.Effect of Carrier Type on Startup and Operating Efficiency of Moving Bed Biofilm Reactor[J].China Water & Wastewater,2018,34(2):1.
[2]郑临奥,吴迪,张晶晶,等.城市污水泵站改为河道生态补给站的实践总结[J].中国给水排水,2018,34(20):82.
ZHENG Lin ao,WU Di,ZHANG Jing jing,et al.Practice of River Ecological Replenishment Retrofitting from an Urban Sewage Pumping Station[J].China Water & Wastewater,2018,34(2):82.
[3]郭莉芳,朱宇峰,滕良方,等.MBBR用于南方某污水厂强化脱氮效果分析[J].中国给水排水,2020,36(7):101.
[4]周家中,吴迪,郑临奥.纯膜MBBR工艺在国内外的工程应用[J].中国给水排水,2020,36(22):37.
ZHOU Jia-zhong,WU Di,ZHENG Lin-ao.Engineering Application of Pure MBBR Process at Home and Abroad[J].China Water & Wastewater,2020,36(2):37.
[5]杨平,周家中,管勇杰,等.基于MBBR的AAO和Bardenpho工艺改造效果对比[J].中国给水排水,2021,37(7):11.
YANG Ping,ZHOU Jia-zhong,GUAN Yong-jie,et al.Comparison of AAO and Bardenpho Processes Transformation Effect Based on MBBR[J].China Water & Wastewater,2021,37(2):11.
[6]孙庆花,张晓霞,赵益华,等.天津某高盐高排放标准污水厂提标改造工程设计[J].中国给水排水,2021,37(8):83.
SUN Qing-hua,ZHANG Xiao-xia,ZHAO Yi-hua,et al.Design of a Wastewater Treatment Plant Upgrading Project with High Salinity Influent and High Discharge Standard in Tianjin[J].China Water & Wastewater,2021,37(2):83.
[7]周家中,宋平周,张爽,等.占地受限下北方某高标准新建污水厂工程设计[J].中国给水排水,2021,37(12):76.
ZHOU Jia-zhong,SONG Ping-zhou,ZHANG Shuang,et al.Engineering Design of a New High-standard Wastewater Treatment Plant with Limited Footprint Area in North China[J].China Water & Wastewater,2021,37(2):76.
[8]陈如勇,张晓霞,周家中,等.MSBR改为三级A/O-MBBR连续流工艺的应用效果[J].中国给水排水,2021,37(14):108.
CHEN Ru-yong,ZHANG Xiao-xia,ZHOU Jia-zhong,et al.Practical Application Effect of Retrofitted MSBR into Three-stage A/O-MBBR Continuous Flow Process[J].China Water & Wastewater,2021,37(2):108.
[9]王雪欣,毕学军,麻弛张,等.两点进水三段A/O-MBBR生物脱氮中试研究[J].中国给水排水,2021,37(17):62.
WANG Xue-xin,BI Xue-jun,MA Chi-zhang,et al.Nitrogen Removal of Pilot-scale Three Stages A/O-MBBR with Two-step-feed[J].China Water & Wastewater,2021,37(2):62.
[10]周小琳,樊星,毕学军,等.两段式A/O-MBBR工艺生物脱氮中试与系统优化[J].中国给水排水,2021,37(19):72.
ZHOU Xiao-lin,FAN Xing,BI Xue-jun,et al.Pilot-scale Test and System Optimization of Two-stage A/O-MBBR Process for Biological Nitrogen Removal[J].China Water & Wastewater,2021,37(2):72.