[1]王美凤,渠元闯,沈振锁,等.DN3 000钢管顶管用于引水工程检修应急通道[J].中国给水排水,2023,39(4):108-111.
WANGMei-feng,QUYuan-chuang,SHENZhen-suo,et al.Application of DN3 000 Steel Pipe Jacking in Emergency Access of Zhaoshandu Water Diversion Project[J].China Water & Wastewater,2023,39(4):108-111.
点击复制
WANGMei-feng,QUYuan-chuang,SHENZhen-suo,et al.Application of DN3 000 Steel Pipe Jacking in Emergency Access of Zhaoshandu Water Diversion Project[J].China Water & Wastewater,2023,39(4):108-111.
DN3 000钢管顶管用于引水工程检修应急通道
中国给水排水[ISSN:1000-4062/CN:12-1073/TU]
卷:
第39卷
期数:
2023年第4期
页码:
108-111
栏目:
出版日期:
2023-02-17
- Title:
- Application of DN3 000 Steel Pipe Jacking in Emergency Access of Zhaoshandu Water Diversion Project
- Keywords:
- pipe jacking; sinking well; high-pressure jet grouting pile
- 摘要:
- 赵山渡引水工程沙门段检修应急通道采用了DN3 000大直径钢管顶管技术,顶管全程位于深厚淤泥层,是温州市目前正在运行的最大钢管顶管输水工程。通过沉井结构应用、沉井外围高压旋喷桩帷幕、管道环氧玻璃鳞片外防腐、穿河低厚度覆土段压载等措施,成功解决了顶管施工对周边环境的不利影响、管道耐久性和低厚度覆土顶管穿越可能产生的土体失稳等突出问题。2021年10月,该工程顺利完工并通水。
- Abstract:
- The application of DN3 000 large diameter steel pipe jacking wholly located in deep silt layer in Shamen Emergency Access of Zhaoshandu Water Diversion Project is the largest steel pipe jacking water conveyance project in Wenzhou at present. The problems of surrounding environment impact of pipe jacking, durability of the pipeline and the soil instability caused low thickness are successfully solved by application of caisson structure, high-pressure jet grouting pile curtain, external corrosion prevention of epoxy glass flake and ballast on low thickness soil of river crossing pipeline. The project was successfully completed and began supplying water in October 2021.
相似文献/References:
[1]杨睿,曾德星,崔旭辉.大直径穿湖顶管回退施工关键技术研究[J].中国给水排水,2024,40(6):126.
YANGRui,ZENG De-xing,CUIXu-hui.Research on Key Techniques for Backward Construction of Large Diameter Pipe Jacking under a Lake[J].China Water & Wastewater,2024,40(4):126.
[2]沈青松,陈烨,叶盛华,等.长距离注浆顶管顶力规范公式的取值研究及分析[J].中国给水排水,2024,40(20):63.
SHENQing-song,CHENYe,YESheng-hua,et al.Research and Analysis on the Standard Formula Value for the Jacking Force of Long?distance Grouting Pipes[J].China Water & Wastewater,2024,40(4):63.
更新日期/Last Update:
2023-02-17