XIAPei-qing.Application of Modified AAO and Micro-flocculation Process in Highly Intensive Semi-underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(16):83-88.
改良AAO+微絮凝工艺用于高集约半地下式污水厂
- Title:
- Application of Modified AAO and Micro-flocculation Process in Highly Intensive Semi-underground Wastewater Treatment Plant
- Keywords:
- wastewater treatment plant; semi-underground; modified AAO; micro-flocculation; fiber turntable filter
- 摘要:
- 广东省某污水处理厂规模为5×104 m3/d,采用改良AAO+微絮凝+纤维转盘滤池工艺,建设型式为半地下式。景观上盖的外观,综合楼、变配电间与主厂房的合理分置以及内部构筑物的高集约化组合设计解决了项目紧邻居住区、用地分散且面积严重不足的工程难点。运行结果表明,出水水质稳定优于《城镇污水处理厂污染物排放标准》(GB 18918—2002)一级A标准和广东省地方标准《水污染物排放限值》(DB 44/26—2001)第二时段一级标准中的较严值。该项目厂界环境与周边协调,污水单位投资3 334元/m3,吨水运行可变成本0.57元/m3,经济性良好。
- Abstract:
- The process of a semi?underground wastewater treatment plant (WWTP) with scale of 5×104 m3/d in Guangdong Province consists of modified AAO, micro-flocculation and fiber turntable filter. The setting of landscape cover, the reasonable distribution of comprehensive building, electric distribution room and the main factory building, and the highly intensive combined design of the internal structures solved the difficulties in adjacent to the residential area, scattered land and serious shortage of footprint area. The operational results show that the effluent quality is better than the stricter values of the first level A limit specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) and the first level limit during the second period specified in the Guangdong local standard of Discharge Limits of Water Pollutants (DB 44/26-2001). The boundary environment of the plant is coordinated with the surrounding area. The wastewater unit investment is 3 334 yuan/m3, and the variable cost is 0.57 yuan/m3, indicating that good economic benefit is obtained.
相似文献/References:
[1]王 亮.马来西亚Pantai地埋式污水厂环网供配电结构设计[J].中国给水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(16):63.
[2]侯晓庆,邓 磊,高海英,等.MBR工艺在神定河污水处理厂升级改造工程中的应用[J].中国给水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(16):66.
[3]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):13.
[4]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——建模与体检[J].中国给水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(16):23.
[5]张月,王阳,张宏伟,等.阳泉市污水处理二期工程BARDENPHO工艺设计和运行[J].中国给水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):64.
[6]祝新军,蔡芝斌,姚斌,等.绍兴污水处理厂气浮设备的优化改造[J].中国给水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101.
[7]王文明,杨淇椋,蔡依廷,等.MSBR工艺在高排放标准污水处理厂的应用[J].中国给水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(16):111.
[8]郝二成,郭毅,刘伟岩,等.基于数学模拟的污水厂运行分析——控制与优化[J].中国给水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(16):23.
[9]王阳,张月,王晓康,等.高排放标准下的改良AAO+深度处理工程案例[J].中国给水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(16):56.
[10]郑枫,慕杨,孙逊.MBR工艺用于山东省某污水处理厂扩建工程[J].中国给水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(16):81.