JIPeng-zhou,YUANJin,YANGZhi-hong,et al.Whole Process Testing and Application of Pre-anoxic A2/O and AO Process[J].China Water & Wastewater,2023,39(18):112-119.
前置预缺氧A2/O+AO工艺全流程测试与应用研究
- Title:
- Whole Process Testing and Application of Pre-anoxic A2/O and AO Process
- Keywords:
- wastewater treatment plant; process optimization; pre-anoxic A2/O and AO process; whole process test; nitrogen and phosphorus removal; energy saving and consumption reducing
- 摘要:
- 以山西省某城镇污水处理厂前置预缺氧A2/O+AO工艺为研究对象,通过全流程测试评估工艺现状,指导工艺调控,优化脱氮除磷效果,同时实现节能降耗,降低运行成本。基于全流程测试结果,采取调整好氧区曝气模式、增设消氧区、协同调整外回流比及进水配比、降低污泥浓度、调整碳源投加点位等优化措施后,出水TN由13.21 mg/L降至8.74 mg/L,TN去除率由71%提高至79%,对PO43--P的去除率由82%提高至98%,该厂生物脱氮除磷效能得到较大提升,同时每月可节省碳源费用14万元,经济效益明显。
- Abstract:
- The A2/O and AO process of a municipal wastewater treatment plant (WWTP) in Shanxi Province is studied to evaluate the current status of the process, guide the process regulation and control, optimize the effect of nitrogen and phosphorus removal, save energy and reduce consumption, reduce operating costs at the same time through whole process testing. Based on the results of the whole process test, the effluent TN was reduced from 13.21 mg/L to 8.74 mg/L, the TN removal rate was increased from 71% to 79%, and the PO43--P removal rate was increased from 82% to 98% after taking the optimization measures such as adjusting the aeration mode of aerobic zone, adding an oxygen elimination zone, adjusting the ratio of external return flow and influent, reducing the sludge concentration, and adjusting the carbon source dosage point. The efficiency of biological nitrogen and phosphorus removal in the WWTP was greatly improved, while the monthly cost of carbon source could be saved by 140 000 yuan, which has an obvious economic benefit.
相似文献/References:
[1]周亚梁,郭俊希,谢势导,等.珠海某接收工业废水污水处理厂工艺调控措施[J].中国给水排水,2024,40(22):131.
ZHOUYa-liang,GUOJun-xi,XIEShi-dao,et al.Process Control Measures of a Sewage Treatment Plant Receiving Industrial Wastewater in Zhuhai[J].China Water & Wastewater,2024,40(18):131.
[2]盖鑫.芜湖市某污水处理厂二期提标扩容工程设计[J].中国给水排水,2023,39(14):80.
GAIXin.Design of a Wastewater Treatment Plant Phase Ⅱ Upgrading and Expansion Project in Wuhu City[J].China Water & Wastewater,2023,39(18):80.
[3]高绪涛,田津.污水处理厂多模式生物反应池的设计应用分析[J].中国给水排水,2023,39(14):124.
GAOXu-tao,TIANJin.Design and Application Analysis of Multi-mode Biological Reaction Tank in a WWTP[J].China Water & Wastewater,2023,39(18):124.
[4]夏沛青.改良AAO+微絮凝工艺用于高集约半地下式污水厂[J].中国给水排水,2023,39(16):83.
XIAPei-qing.Application of Modified AAO and Micro-flocculation Process in Highly Intensive Semi-underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(18):83.
[5]王保贵,蔺洪永,刘玉婷,等.污水处理厂积砂情况分析与防治对策[J].中国给水排水,2023,39(18):107.
WANGBao-gui,LINHong-yong,LIUYu-ting,et al.Analysis of Grit Sediment in a Sewage Treatment Plant and the Prevention Countermeasures[J].China Water & Wastewater,2023,39(18):107.
[6]欧阳卓明,罗凡,孙先昌,等.基于BioWin对AAO-MBR工艺的生物除磷优化[J].中国给水排水,2025,41(7):82.
OUYANGZhuo-ming,LUOFan,SUNXian-chang,et al.Optimization of Biological Phosphorus Removal in AAO-MBR Process Using BioWin Simulation[J].China Water & Wastewater,2025,41(18):82.
[7]邱明海.北京市垡头污水处理厂改扩建工程设计技术方案[J].中国给水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(18):13.
[8]费荣鑫,向力,黄筹,等.污水处理厂金属盐泥资源化回收及其吸附除磷性能[J].中国给水排水,2022,38(23):1.
FEIRong-xin,XIANGLi,HUANGChou,et al.Adsorption Removal of Phosphate in Wastewater by Metal-containing Salt Sludge Recovered from WWTP[J].China Water & Wastewater,2022,38(18):1.
[9]赵剑强,张局,史冰峰,等.剩余污泥衰减系数取值范围探讨[J].中国给水排水,2022,38(24):53.
ZHAOJian-qiang,ZHANGJu,SHIBing-feng,et al.Discussion on the Value Range of Excess Sludge Decay Coefficient[J].China Water & Wastewater,2022,38(18):53.
[10]戴杨叶,张大鹏,伍林芳,等.某污水处理厂提标工程中的氧化沟改造实践[J].中国给水排水,2022,38(24):92.
DAIYang-ye,ZHANGDa-peng,WULin-fang,et al.Reconstruction Practice of Oxidation Ditch in a WWTP Upgrading Project[J].China Water & Wastewater,2022,38(18):92.