HPB技术应用于污水处理厂原位扩容改造
中国给水排水[ISSN:1000-4062/CN:12-1073/TU]
卷:
第39卷
期数:
2023年第20期
页码:
98-103
栏目:
出版日期:
2023-10-17
- Title:
- HPB Process Applied In-situ Capacity Expansion and Reconstruction of a WWTP
- 关键词:
- 高浓度复合粉末载体生物流化床; 原位扩容; 溢流污染; 不停水改造
- Keywords:
- high concentration powder carrier bio?fluidized bed; in-situ capacity expansion; overflow pollution; renovation without water suspension
- 摘要:
- 为消除厂外管网溢流污染,江苏某污水处理厂面临着处理规模从3.0×104 m3/d提升至4.0×104 m3/d的扩容需求,同时需采用工期短、占地小、投资省和运营成本低的解决方案。针对上述需求,采用了高浓度复合粉末载体生物流化床(HPB)工艺对该厂进行原位扩容改造。改造结果表明,HPB技术大幅提高了处理水量(稳定在4.0×104 m3/d以上),出水主要指标满足COD≤30 mg/L、NH3-N≤1.5 mg/L、TN≤10 mg/L、TP≤0.3 mg/L的排放标准;在不增加占地的情况下,改造总工期仅85 d,且全程不停水。与改造前相比,碳源投加量减少50 mg/L,运行成本节省约0.09 元/m3。
- Abstract:
- In order to eliminate the overflow pollution of the pipe network outside the plant in Jiangsu Province, a wastewater treatment plant (WWTP) is facing the requirements of promoting the treatment capacity from 3.0×104 m3/d to 4.0×104 m3/d, and solutions with short construction period, small land occupation, low investment and low operation cost. In view of the above requirements, high concentration powder carrier bio-fluidized bed (HPB) technology is adopted to carry out in-situ expansion and reconstruction of the WWTP. The transformation results show that the HPB technology has greatly increased the wastewater treatment capacity as stably above 4.0×104 m3/d, the main effluent quality indexes meet the discharge standards of COD≤30 mg/L, NH3-N≤1.5 mg/L, TN≤10 mg/L, and TP≤0.3 mg/L, respectively. Without increasing land occupation and without water suspension throughout the whole process, the total construction period of the reconstruction is only 85 days. Compared with pre-renovation, the dosage of carbon source is reduced by 50 mg/L, and the operating cost is saved by 0.09 yuan/m3.
相似文献/References:
[1]柴晓利,韩红波,张宏亮,等.HPB工艺用于污水厂提标扩容改造的生产性试验研究[J].中国给水排水,2021,37(1):9.
CHAI Xiao-li,HAN Hong-bo,ZHANG Hong-liang,et al.Full-scale Test of HPB Process Applied in Upgrading and Capacity Expansion of a Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(20):9.
[2]韩红波,王成显,牟悦,等.北方城镇污水处理厂提标扩容HPB技术中试研究[J].中国给水排水,2023,39(13):81.
HANHong-bo,WANGCheng-xian,MOUYue,et al.Piolt Test of HPB Technology Applied in Upgrading and Expansion of a Municipal Wastewater Treatment Plant in North China[J].China Water & Wastewater,2023,39(20):81.
更新日期/Last Update:
2023-10-17