CHENMei-juan,LIWei-ying,ZHUXiao-yuan,et al.Design of Regulation and Storage System for Combined Overflow Pollution Control in the Longtanxi Lake Area of Beijing[J].China Water & Wastewater,2024,40(18):71-74.
北京市龙潭西湖流域合流制溢流污染调蓄系统设计
- Title:
- Design of Regulation and Storage System for Combined Overflow Pollution Control in the Longtanxi Lake Area of Beijing
- 关键词:
- 合流制溢流; 硅砂蜂巢过滤净化技术; 调蓄池
- Keywords:
- combined sewer overflow; silicon sand honeycomb filtration and purification technology; regulation and storage tank
- 摘要:
- 龙潭西湖位于北京市中心城区,承接上游地区雨污合流暗沟排水。大雨时,暗沟中的合流制溢流排入龙潭西湖,造成湖水环境恶化。为了有效缓解龙潭西湖合流制溢流污染,综合考虑水环境和水安全的治理目标,在龙潭西湖湖底设置有效容积为62 000 m3的调蓄系统截流合流制溢流,采用硅砂蜂巢过滤净化创新技术实现对合流制溢流过滤、净化后再排放。项目实施后,汛期年均溢流次数不大于4 次,缓解了龙潭西湖合流制溢流污染,非汛期实现了湖水循环净化。
- Abstract:
- Longtanxi Lake, located in the downtown area of Beijing, undertakes the drainage of rainwater and sewage in the upper reaches through underground ditches. During heavy rain, the combined overflow water in the underground ditches is discharged into Longtanxi Lake, resulting in a deterioration of the lake’s aquatic environment. In order to effectively alleviate the pollution caused by the combined sewer overflow in Longtanxi Lake and comprehensively consider the governance goals of water environment and water safety, the project addresses this issue by installing an innovative regulation and storage system at the bottom of the lake with an effective volume of 62 000 m3 to capture and detain the combined overflow. The regulation and storage tank system adopts silica sand honeycomb structure, which is convenient for the combined overflow to be filtered and purified before being discharged. After the project is implemented, the average annual overflow frequency shall not exceed 4 times in flood season, which can effectively alleviate the pollution caused by the combined overflow. During non?flood season, the system enables the lake water to be circulated and purified.
相似文献/References:
[1]赵泽坤,车伍,赵杨,等.美国合流制溢流污染控制灰绿设施结合的经验[J].中国给水排水,2018,34(20):36.
ZHAO Ze kun,CHE Wu,ZHAO Yang,et al.Experiences of Combination of Gray-Green Infrastructure for Combined Sewer Overflow Control in the United States[J].China Water & Wastewater,2018,34(18):36.
[2]莫俊锋,王文亮,白献宇,等.基于设计暴雨法的CSO调蓄池池容计算方法探讨[J].中国给水排水,2020,36(8):77.
[3]韩靖博,杨默远,潘兴瑶,等.合流制排水分区海绵城市多层级调控效果定量评估[J].中国给水排水,2020,36(19):95.
HAN Jing-bo,YANG Mo-yuan,PAN Xing-yao,et al.Quantitative Evaluation of Multi-level Regulation Effect of Sponge City in Combined Drainage Zone[J].China Water & Wastewater,2020,36(18):95.
[4]史昊然.合流制溢流调蓄处理工艺效果评估及优化对策[J].中国给水排水,2021,37(5):106.
SHI Hao-ran.Performance Evaluation and Optimization Solutions of Combined Sewer Overflow Storage and Treatment Process[J].China Water & Wastewater,2021,37(18):106.
[5]常胜昆,周丹,马洪涛,等.厦门浯溪黑臭水体合流制溢流污染控制技术[J].中国给水排水,2021,37(6):1.
CHANG Sheng-kun,ZHOU Dan,MA Hong-tao,et al.Technical Research on CSO Pollution Control of Black and Odorous Water Body of Wuxi River in Xiamen[J].China Water & Wastewater,2021,37(18):1.
[6]邹安平.合流制溢流污染调蓄池设计容积数值模拟[J].中国给水排水,2022,38(5):116.
ZOUAn-ping.Numerical Simulation of Design Volume of Combined Sewer Overflow Storage Tank[J].China Water & Wastewater,2022,38(18):116.
[7]张磊,杨卫国,王浩正,等.辅助设计CSO调蓄池的动态模拟工具[J].中国给水排水,2022,38(18):6.
ZHANGLei,YANGWei-guo,WANGHao-zheng,et al.A Dynamic Simulation Tool for Aided Design of CSO Storage Tanks[J].China Water & Wastewater,2022,38(18):6.
[8]尹华升,柳畅,谭觉,等.《湖南省排水系统溢流污染控制技术导则》解读[J].中国给水排水,2024,40(16):18.
YINHua-sheng,LIUChang,TANJue,et al.Explanation of Technical Guideline for Overflow Pollution Control of Sewer System in Hunan Province[J].China Water & Wastewater,2024,40(18):18.