CHENWei,GAOMing-lang,HUANGYu-chu,et al.Underground Wastewater Treatment Plants in China: Current Status and Further Development[J].China Water & Wastewater,2025,41(14):35-43.
国内地下式污水处理厂的现状与发展
- Title:
- Underground Wastewater Treatment Plants in China: Current Status and Further Development
- Keywords:
- underground wastewater treatment plants; land-saving advantage; treatment capacity; treatment process
- 摘要:
- 随着经济的快速发展与城镇化进程的加快,地下式污水处理厂因其占地小、可提升周边土地价值等优势在国内受到广泛关注。相比于地上式污水处理厂,地下式污水处理厂不仅能降低“邻避”效应,还能为城市土地资源节约与环境承载力提升作出较大贡献。然而,当前研究仍缺乏对国内地下式污水处理厂不同规模、工艺选择及节地效果等基本情况的系统认识,且对于地下式污水处理厂投资建设与未来发展亟待分析。基于此,总结了国内地下污水处理厂工程案例的建设经验,分析了地下式污水处理厂的占地情况及实现节地优势工艺的选取,并讨论了在“双碳”背景下地下式污水处理厂的发展方向,以期为我国地下污水处理厂的建设与发展提供参考。
- Abstract:
- With rapid economic development and accelerated urbanization, underground wastewater treatment plants (WWTPs) have drawn increasing attention due to their low land demand and high surrounding land value. Compared with conventional WWTPs, the underground WWTPs could significantly reduce negative environmental impacts (the Not-In-My-Backyard effect) and contribute to saving urban land and enhancing environmental carrying capacity. However, the current research still lacks a systematic understanding of the underground WWTPs with different capacities, different processes selection, and land-saving effect. Moreover, analysis of the investment, construction, and future development of the underground WWTPs are necessary. In this context, the construction experience of domestic underground WWTPs was summarized, and the land occupation of underground WWTP as well as the process selection for achieving land-saving advantages were analyzed, and the development direction of underground WWTP under the “dual carbon” goals was discussed, providing technical references for the construction and development of underground WWTPs in China in the future.
相似文献/References:
[1]郝晓地,于文波,王向阳,等.地下式污水处理厂全生命周期综合效益评价[J].中国给水排水,2021,37(7):1.
HAO Xiao-di,YU Wen-bo,WANG Xiang-yang,et al.Life Cycle Comprehensive Efficiency Assessment on Underground Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(14):1.
[2]颜廷文,邳竞尧,刘世德.大型地下式污水处理厂中臭氧处理工艺的设计[J].中国给水排水,2021,37(10):89.
YAN Ting-wen,PI Jing-yao,LIU Shi-de.Design of Ozonation Process in Large Underground Sewage Treatment Plant[J].China Water & Wastewater,2021,37(14):89.
[3]陈秀成.地下式污水处理厂用地指标分析及节地设计方向[J].中国给水排水,2023,39(4):53.
CHENXiu-cheng.Analysis of Land Quota and Land Conservation Design Direction of Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(14):53.
[4]董磊,张欣,杨一烽.《城镇地下式污水处理厂技术规程》要点简析[J].中国给水排水,2023,39(16):14.
DONGLei,ZHANGXin,YANGYi-feng.Synopsis of Key Points for Technical Specification for Urban Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(14):14.
[5]仲崇军,代世宇,王曼,等.地下式污水处理厂“双降一增”设计案例[J].中国给水排水,2024,40(4):59.
ZHONGChong-jun,DAIShi-yu,WANGMan,et al.Double Reduction and One Increase” of Underground Sewage Treatment Plant: A Design Case[J].China Water & Wastewater,2024,40(14):59.
[6]杨涛,何帅,崔容,等.地下式污水处理厂的卫生防护距离及臭气污染控制[J].中国给水排水,2024,40(6):67.
YANGTao,HEShuai,CUIRong,et al.Health Protection Zone and Odor Pollution Control of the Underground Wastewater Treatment Plant[J].China Water & Wastewater,2024,40(14):67.
[7]魏海娟.大型地下式污水处理厂工艺设计与运行效果分析[J].中国给水排水,2024,40(8):60.
WEIHai-juan.Design of a Large Underground Wastewater Treatment Plant and Its Operation Performance Analysis[J].China Water & Wastewater,2024,40(14):60.
[8]叶丽丽,赵健.某地下式污水厂AAOA-MBR-臭氧催化氧化设计[J].中国给水排水,2025,41(22):51.
YELi-li,ZHAOJian.Design of AAOA-MBR-Catalytic Ozonation Process in an Underground Wastewater Treatment Plant[J].China Water & Wastewater,2025,41(14):51.
[9]吴晓宇,张建良,文隆佳,等.龙归污水处理厂三期扩建工程设计[J].中国给水排水,2025,41(24):63.
WUXiao-yu,ZHANGJian-liang,WENLong-jia,et al.Design of Longgui Wastewater Treatment Plant Phase Ⅲ Expansion Project[J].China Water & Wastewater,2025,41(14):63.
[10]廖竞萌,王国冬,莫华荣,等.公园城市理念下大型地下式污水处理厂设计及实践[J].中国给水排水,2026,42(6):76.
LIAOJingmeng,WANGGuodong,MOHuarong,et al.Design of a Large-scale Underground Wastewater Treatment Plant under the Park City Concept[J].China Water & Wastewater,2026,42(14):76.