LIYuan,ZHANGRu-tao,LIUQi-xuan,et al.Efficiency of Constructed Wetlands in Removing Conventional Pollutants and Estrogens from Rural Sewage[J].China Water & Wastewater,2025,41(21):144-148.
人工湿地去除农村污水中常规污染物和雌激素效能
- Title:
- Efficiency of Constructed Wetlands in Removing Conventional Pollutants and Estrogens from Rural Sewage
- Keywords:
- constructed wetland; filler; hydraulic retention time; rural sewage; estrogenic pollutants
- 摘要:
- 分别选择沸石、铁碳、硫铁矿作为人工湿地的填料,考察其对农村污水中常规污染物以及雌酮(E1)、雌二醇(E2)、17α-乙炔雌二醇(EE2)等典型雌激素污染物的去除效果,同时分析了常规沸石填料人工湿地在不同水力停留时间(HRT)下对污染物的去除效果。结果表明,在相同HRT下,铁碳填料人工湿地对常规污染物及雌激素的去除率最高,硫铁矿填料人工湿地次之;相比沸石填料人工湿地,铁碳填料人工湿地对COD、NH3-N、TN、TP的去除率分别提高29.30%、47.39%、30.80%和62.38%,对E1、E2、EE2的去除率分别提高59.49%、63.65%和45.35%。在沸石填料人工湿地中,随着HRT的延长,常规污染物和雌激素的去除效果逐渐提升,与HRT=12 h相比,当HRT=36 h时,COD、NH3-N、TN、TP去除率分别提高20.12%、20.22%、10.98%和34.35%,E1、E2、EE2去除率分别提高43.68%、37.75%和39.78%。
- Abstract:
- Zeolite, iron-carbon composites, and pyrite were selected as fillers for constructed wetlands to evaluate their performance in removing conventional pollutants from rural sewage as well as typical estrogenic pollutants, including estrone (E1), estradiol (E2), and 17α-ethinylestradiol (EE2). Additionally, the pollutants removal efficiency of conventional zeolite-filled constructed wetlands was examined under varying hydraulic retention times (HRTs). Under the same HRT, the iron-carbon-filled constructed wetland exhibited the highest removal efficiency for both conventional pollutants and estrogens, followed by the pyrite-filled constructed wetland. Compared with the zeolite-filled constructed wetland, the iron-carbon-filled system achieved 29.30%, 47.39%, 30.80%, and 62.38% higher removal efficiencies for COD, NH3-N, TN, and TP, respectively, and demonstrated 59.49%, 63.65%, and 45.35% greater removal efficiencies for E1, E2, and EE2, respectively. In zeolite-filled constructed wetlands, the removal efficiency of both conventional pollutants and estrogenic pollutants gradually improved with increasing HRT. Compared to the HRT of 12 hours, extending the HRT to 36 hours resulted in increases in the removal efficiencies of COD, NH3-N, TN, and TP by 20.12%, 20.22%, 10.98%, and 34.35%, respectively. Similarly, the removal efficiencies of E1, E2, and EE2 were enhanced by 43.68%, 37.75%, and 39.78%, respectively.
相似文献/References:
[1]杜曼曼,张琼华,连斌,等.城市污水处理厂尾水人工湿地净化工程调试与运行[J].中国给水排水,2020,36(9):94.
[2]王晓云,蒋柱武,付爱民.UASB+两级人工湿地组合工艺处理农村污水[J].中国给水排水,2020,36(11):21.
[3]杜建强,杜滢明,张瑛,等.昆山珠泾中心河黑臭河道的系统施治设计与应用效果[J].中国给水排水,2020,36(12):129.
DU Jian-qiang,DU Ying-ming,ZHANG Ying,et al.Design and Application Effect of Systematic Treatment of Black and Odorous River in Zhujing Central River, Kunshan[J].China Water & Wastewater,2020,36(21):129.
[4]Jan Vymazal,卫婷,赵亚乾,等.细数植物在人工湿地污水处理中的作用[J].中国给水排水,2021,37(2):25.
Jan Vymazal,WEI Ting,ZHAO Ya-qian,et al.Counting the Roles of Plants in Constructed Wetlands for Wastewater Treatment[J].China Water & Wastewater,2021,37(21):25.
[5]邓敬轩,周润杰,单晓红,等.携菌新型生物质基材用于微污染水体治理[J].中国给水排水,2021,37(11):1.
DENG Jing-xuan,ZHOU Run-jie,SHAN Xiao-hong,et al.Biomass Substrate Carrying Bacteria for Treatment of Micro-polluted River Water[J].China Water & Wastewater,2021,37(21):1.
[6]管凛,陶梦妮,荆肇乾.人工湿地—微生物燃料电池强化尾水脱氮产电效能[J].中国给水排水,2021,37(13):7.
GUAN Lin,TAO Meng-ni,JING Zhao-qian.Enhanced Nitrogen Removal and Electricity Generation Efficiency of Constructed Wetland-Microbial Fuel Cells for Purification of Tail Water from Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(21):7.
[7]许青兰,孔令为,沈浙萍,等.浙江省档案局微污染景观水体生态修复工程实例[J].中国给水排水,2021,37(16):108.
XU Qing-lan,KONG Ling-wei,SHEN Zhe-ping,et al.Demonstration of Ecological Restoration Project for Micro-polluted Landscape Waters in Zhejiang Provincial Archives Bureau[J].China Water & Wastewater,2021,37(21):108.
[8]王晓云,付爱民,李启明.曝气氧化塘+人工湿地组合工艺处理农村污水[J].中国给水排水,2021,37(21):64.
WANG Xiao-yun,FU Ai-min,LEE King-ming.Combined Process of Aeration Pond and Constructed Wetland for Treatment of Rural Sewage[J].China Water & Wastewater,2021,37(21):64.
[9]肖海文,刘馨瞳,翟俊,等.人工湿地类型的选择及案例分析[J].中国给水排水,2021,37(22):11.
XIAO Hai-wen,LIU Xin-tong,ZHAI Jun,et al.Type Selection of Constructed Wetlands and Related Design Case Analysis[J].China Water & Wastewater,2021,37(21):11.
[10]姜春杰.改良Bardenpho+粉末活性炭+人工湿地处理生活污水[J].中国给水排水,2022,38(2):93.
JIANG Chun?jie.Application of Improved Bardenpho, PAC and Constructed Wetland Process in Sewage Treatment[J].China Water & Wastewater,2022,38(21):93.