WANG Yu-hua,TANG Jin-feng,WANG Jian.Reason Analysis and Reinforcement Treatment of Inclined Pile in Oxidation Ditch of WWTP[J].China Water & Wastewater,2018,34(22):71-76.
污水厂氧化沟基桩倾斜原因分析及加固处理
- Title:
- Reason Analysis and Reinforcement Treatment of Inclined Pile in Oxidation Ditch of WWTP
- 文章编号:
- 1000-4602(2018)22-0071-06
- Keywords:
- oxidation ditch; pile inclination; reinforcement treatment
- 分类号:
- TU992.3
- 文献标志码:
- C
- 摘要:
- 某污水处理厂氧化沟桩基施工结束后,在氧化沟北侧进行了管道开挖施工。因管道施工未对原氧化沟基桩采取保护措施,在氧化沟区域开挖至设计标高时,发现桩基部分区域桩头发生了倾斜。由于目前基桩倾斜加固处理缺乏相关的工程经验和理论,在处理时较为复杂。结合实际工程,利用传统计算与有限元软件Abaqus建立桩土模型对基桩倾斜进行了损伤分析与研究,最终确定对偏位较小基桩进行灌芯加固,对偏位较大基桩采用树根桩进行补桩处理。经检测证明,处理后的桩基符合设计要求,同时氧化沟后期运行监测结果良好,为今后类似工程问题的处理提供了参考及理论依据。
- Abstract:
- After the completion of pile foundation construction of oxidation ditch in a WWTP, pipeline excavation was carried out on the north side of the oxidation ditch. Since there was no protective measure for pile foundation in pipeline construction, the pile foundation was inclined when the oxidation ditch area was excavated to design elevation. Due to the lack of relevant construction experience and theory for reinforcement of the inclined pile, it was more complicated to deal with pile inclination situation. In this paper, the traditional calculation and finite element software Abaqus were both used to analyze the damage of pile slope. It was finally determined that the small offset pile was reinforced with core, and the large deviation pile was treated with root pile. The test results showed that the treated pile foundation could meet the design requirements, and the monitoring results of the later operation of the oxidation ditch were good. It could provide reference and theoretical research basis for similar project problems in the future.
参考文献/References:
[1] 吕凡任,陈云敏,陈仁朋,等. 任意倾角斜桩承受任意平面荷载的弹性分析[J]. 浙江大学学报:工学版,2004,38(2):191-194.
Lu Fanren,Chen Yunmin,Chen Renpeng,et al. Analysis of batter pile under arbitrary inclined loads in semi-infinite solid[J]. Journal of Zhejiang University:Engineering Science,2004,38(2):191-194(in Chinese).
[2] 王来义. 斜桩群桩力学性能模拟分析[D]. 兰州:兰州交通大学,2015.
Wang Laiyi. Stress Simulation Analysis of Inclined Pile Group[D]. Lanzhou:Lanzhou Jiaotong University,2015(in Chinese).
[3] 李龙起,罗书学.非均匀地基中倾斜桩基竖向承载特性模拟试验研究[J].岩土力学,2012,33(5):1300-1305.
Li Longqi,Luo Shuxue. A simulation test study of vertical bearing capacity of inclined pile foundation in inhomogeneous strata[J]. Rock and Soil Mechanics,2012,33(5):1300-1305(in Chinese).
[4] 傅花.竖向荷载作用下斜桩承载特性模型试验研究[J]. 人民长江,2016,47(5):90-94.
Fu Hua. Model test study on bearing behavior of inclined pile under vertical load[J]. Yangtze River,2016,47(5):90-94(in Chinese).
[5] 秦力,许慧,张冬生,等.斜桩单桩水平静载试验及MIDAS GTS有限元模拟分析[J].东北电力大学学报,2016,36(1):29-35.
Qin Li,Xu Hui,Zhang Dongsheng,et al. Static load testing and MIDAS GTS finite element simulation analysis of batter single pile[J]. Journal of Northeast Dianli University,2016,36(1):29-35(in Chinese).
[6] JGJ 120—2012,建筑基坑支护技术规程[S]. 北京:中国建筑工业出版社,2012.
JGJ 120-2012,Technical Specification for Retaining andProtection of Building Foundation Excavations[S]. Bei-jing:China Architecture & Building Press,2012(in Chinese).
[7] DG/TJ 08-61-2010,基坑工程技术规范[S]. 上海:上海市建筑建材业市场管理总站,2010.
DG/TJ 08-61-2010,Technical Code for Excavation Engineering[S]. Shanghai:Shanghai Building Materials Industry Market Management Station,2010(in Chinese).
[8] JGJ 94—2008,建筑桩基技术规范[S]. 北京:中国建筑工业出版社,2008.
JGJ 94-2008,Technical Code for Building Pile Foundations[S]. Beijing:China Architecture & Building Press,2008(in Chinese).
相似文献/References:
[1]刘兵,韩燕聪,郭延勇,等.污水处理厂氧化沟曝气系统改造[J].中国给水排水,2021,37(2):109.
LIU Bing,HAN Yan-cong,GUO Yan-yong,et al.Oxidation Ditch Aeration System Modification in Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(22):109.
[2]杨红,白文龙,梅小乐,等.寒冷地区冬季脱氮除磷工艺调控及效果分析[J].中国给水排水,2021,37(6):107.
YANG Hong,BAI Wen-long,MEI Xiao-le,et al.Adjustment and Analysis of Nitrogen and Phosphorus Removal Process to Resist Winter in Cold Regions[J].China Water & Wastewater,2021,37(22):107.
[3]常国松,于静洁,王少坡,等.内循环频次对氧化沟反硝化除磷的影响[J].中国给水排水,2022,38(21):12.
CHANGGuo-song,YUJing-jie,WANGShao-po,et al.Effect of Internal Recirculation Frequency on Denitrifying Phosphorus Removal in Oxidation Ditch[J].China Water & Wastewater,2022,38(22):12.
[4]朱红青,伍波,叶昌明,等.韶关市某污水处理厂氧化沟工艺高出水标准提标改造[J].中国给水排水,2023,39(10):75.
ZHUHong-qing,WUBo,YEChang-ming,et al.Upgrading and Reconstruction of Oxidation Ditch Process with High Effluent Standard in a Wastewater Treatment Plant in Shaoguan City[J].China Water & Wastewater,2023,39(22):75.
备注/Memo
作者简介:王玉华(1963- ), 女, 江苏徐州人, 本科, 高级工程师, 结构副总工程师, 长期从事市政给排水结构设计工作。
E-mail:lyslys9012@126.com
收稿日期:2018-05-25