[1]黄青,杨平,杨忠启,等.MBBR和MBR工艺的污水处理效果与碳排放分析[J].中国给水排水,2023,39(16):99-104.
 HUANGQing,YANGPing,YANGZhong-qi,et al.Analysis on the Engineering Effect and Carbon Emission of MBBR and MBR Processes for Treating Sewage[J].China Water & Wastewater,2023,39(16):99-104.
点击复制

MBBR和MBR工艺的污水处理效果与碳排放分析

相似文献/References:

[1]熊建英.MBBR+磁混凝工艺用于污水处理厂提标改造[J].中国给水排水,2018,34(20):50.
 XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):50.
[2]茹春,张爽,路晖,等.低温条件下污水处理厂的除污效果及运行调控分析[J].中国给水排水,2021,37(9):1.
 RU Chun,ZHANG Shuang,LU Hui,et al.Pollutants Removal Performance and Operation Regulation of Urban Wastewater Treatment Plant under Low Temperature Condition[J].China Water & Wastewater,2021,37(16):1.
[3]彭江喜,李益飞,肖涛,等.MBBR工艺用于南昌市某污水处理厂提标改造工程[J].中国给水排水,2021,37(14):85.
 PENG Jiang-xi,LI Yi-fei,XIAO Tao,et al.Application of MBBR Process in an Upgrading and Reconstruction Project of a Sewage Treatment Plant in Nanchang[J].China Water & Wastewater,2021,37(16):85.
[4]刘影.MBBR、双填料滤池、MBR用于污水厂多期同步扩容提标[J].中国给水排水,2021,37(18):63.
 LIU Ying.Applications of MBBR, Double Packing Media Filter and MBR in Multi-phase Synchronous Expansion and Upgrading of Sewage Treatment Plant[J].China Water & Wastewater,2021,37(16):63.
[5]毛宇洛,石文鹏.江西某厂网一体化项目污水厂调试运行实例[J].中国给水排水,2022,38(4):12.
 MAO Yu-luo,SHI Wen-peng.A Practical Example of Commissioning and Operation of a Wastewater Treatment Plant in a Plant?Network Integration Project in Jiangxi[J].China Water & Wastewater,2022,38(16):12.
[6]李一龙,包宇,邸文正,等.高排放标准下分段进水多级AO+MBR工艺的设计[J].中国给水排水,2022,38(4):76.
 LIYi-long,BAOYu,DIWen-zheng,et al.Design of Step-feed Multi-stage AO+MBR Process under High Discharge Standard[J].China Water & Wastewater,2022,38(16):76.
[7]黄珠慧,朱艳臣,王久龙,等.混凝+两级A/O+MBR工艺处理粪便滤后液[J].中国给水排水,2022,38(24):115.
 HUANGZhu-hui,ZHUYan-chen,WANGJiu-long,et al.Treatment of Fecal Filtrate by a Combined Process of Coagulation, Two-stage A/O and MBR[J].China Water & Wastewater,2022,38(16):115.
[8]刘浩,臧海龙,耿安锋,等.青岛李村河污水处理厂类Ⅳ类标准提标扩建工程设计[J].中国给水排水,2023,39(2):52.
 LIUHao,ZANGHai-long,GENGAn-feng,et al.Design of Quasi Class Ⅳ Discharge Standard Upgrading and Expansion Project in Qingdao Licunhe Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(16):52.
[9]田海成,杨红红,焦文海,等.AAO+MBR组合工艺各工段设计要点[J].中国给水排水,2023,39(6):71.
 TIANHai-cheng,YANGHong-hong,JIAOWen-hai,et al.Key Points for Each Section Design of AAO and MBR Combined Process[J].China Water & Wastewater,2023,39(16):71.
[10]刘强,张磊.UASB+两级AO+MBR工艺处理高浓度原料药废水[J].中国给水排水,2023,39(10):139.
 LIUQiang,ZHANG Lei.Engineering Design of UASB, Two-stage AO, and MBR Process for Treating High Concentration API Wastewater[J].China Water & Wastewater,2023,39(16):139.
[11]李志超,肖宁,林蔓,等.MBBR耦合MBR用于东北某低温高排放标准污水厂[J].中国给水排水,2022,38(14):77.
 LIZhi-chao,XIAONing,LINMan,et al.Application of MBBR Coupled with MBR Process in a Stringent Discharge Standard Wastewater Treatment Plant in Northeast China at Low Temperature[J].China Water & Wastewater,2022,38(16):77.
[12]王凤雪,张新波,尚禹彤,等.MBBR—MBR对磺胺嘧啶的去除及膜污染特性[J].中国给水排水,2023,39(1):80.
 WANGFeng-xue,ZHANGXin-bo,SHANGYu-tong,et al.MBBR-MBR System for Removal of Sulfadiazine and Its Membrane Fouling Characteristics[J].China Water & Wastewater,2023,39(16):80.

更新日期/Last Update: 2023-08-17