[1]张真伟,张诗雄,陈俊,等.全重力流进水的地下污水处理厂防淹设计[J].中国给水排水,2024,40(10):69-74.
 ZHANGZhen-wei,ZHANGShi-xiong,CHENJun,et al.Anti-flooding Design of Underground Sewage Treatment Plant with Gravity- flow Inflow[J].China Water & Wastewater,2024,40(10):69-74.
点击复制

全重力流进水的地下污水处理厂防淹设计

相似文献/References:

[1]郭韬,王瑜,李保泽,等.地下污水处理厂照明系统设计探讨[J].中国给水排水,2020,36(14):99.
 GUO Tao,WANG Yu,LI Bao-ze,et al.Discussion on Design of Lighting System in the Underground Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(10):99.
[2]牛樱,仲崇军,李胜.大型地下市政+工业混合污水处理厂兼顾人防设计案例[J].中国给水排水,2021,37(14):73.
 NIU Ying,ZHONG Chong-jun,LI Sheng.Design Case of Large Underground Municipal and Industrial Mixed Wastewater Treatment Plant with Civil Air Defense Function[J].China Water & Wastewater,2021,37(10):73.
[3]徐进.地下式污水处理厂电气设备除湿方式比较研究[J].中国给水排水,2022,38(14):38.
 XUJin.Comparative Study on Dehumidification Methods of Electrical Equipment in Underground Sewage Treatment Plant[J].China Water & Wastewater,2022,38(10):38.
[4]郭海成.特大型全地下式取水泵站工艺设计及运行安全分析[J].中国给水排水,2023,39(12):62.
 GUOHai-cheng.Design and Operational Safety Analysis of Extra-large Underground Water Intake Pumping Stations[J].China Water & Wastewater,2023,39(10):62.
[5]田海成,杨曦凯,焦文海,等.AAOA+MBR工艺用于济南东客站地下污水处理厂[J].中国给水排水,2023,39(22):78.
 TIANHai-cheng,YANGXi-kai,JIAOWen-hai,et al.Application of AAOA-MBR Process in Jinan Dongkezhan Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(10):78.
[6]李洋洋,彭文峰,雷琳慧,等.基于CFD的地下污水厂无风管式通风系统效果模拟[J].中国给水排水,2024,40(17):104.
 LIYang-yang,PENGWen-feng,LEILin-hui,et al.Simulation Effect of Ductless Ventilation System in Underground Wastewater Treatment Plants Based on CFD[J].China Water & Wastewater,2024,40(10):104.
[7]杜立刚,石亚军,吴志高,等.全地下式污水处理厂站防淹方法及应用实例[J].中国给水排水,2024,40(20):59.
 DULi-gang,SHIYa-jun,WUZhi-gao,et al.Flood Prevention Design Method and Application Case of Underground Sewage Treatment Plant (Station)[J].China Water & Wastewater,2024,40(10):59.

更新日期/Last Update: 2024-05-17