[1]揭小锋,郭迎新,周丹,等.基于“分质分区处理”理念的工业厂房海绵改造策略[J].中国给水排水,2020,36(12):14-19.
JIE Xiao-feng,GUO Ying-xin,ZHOU Dan,et al.Sponge City Reconstruction Strategy of Industrial Plant Based on the Concept of Quality and Regional Division Treatment[J].China Water & Wastewater,2020,36(12):14-19.
点击复制
JIE Xiao-feng,GUO Ying-xin,ZHOU Dan,et al.Sponge City Reconstruction Strategy of Industrial Plant Based on the Concept of Quality and Regional Division Treatment[J].China Water & Wastewater,2020,36(12):14-19.
基于“分质分区处理”理念的工业厂房海绵改造策略
中国给水排水[ISSN:1000-4062/CN:12-1073/TU]
卷:
第36卷
期数:
2020年第12期
页码:
14-19
栏目:
出版日期:
2020-06-17
- Title:
- Sponge City Reconstruction Strategy of Industrial Plant Based on the Concept of Quality and Regional Division Treatment
- Keywords:
- quality and regional division treatment; industrial plant; sponge city reconstruction; low impact development; volume capture ratio of annual rainfall; runoff pollution control ?
- 摘要:
-
工业厂房受其下垫面布局特殊、地下管线复杂及场地径流污染较重、景观不佳等因素影响,区别于小区和公共建筑,在海绵城市改造中具有其自身特点和难点。基于此,有针对性地提出改造策略,打破常规海绵做法,提出“分质分区处理”等创新理念,制定更适宜工业厂房的海绵设施改造方案。以某厂房为例,介绍具体技术改造措施和实施效果,以供同类项目参考。
- Abstract:
-
Due to the special layout of underlying surface, complex underground pipelines, heavy site runoff pollution, poor landscape and etc. the industrial plant is different from residential areas and public buildings, and has its own characteristics and difficulties in the sponge city reconstruction. Based on this, the article puts forward a targeted reconstruction strategy, breaks the general sponge practice, puts forward innovative ideas such as quality and regional division treatment, and formulates a more suitable sponge facility reconstruction scheme for industrial plant. Taking an industrial plant as an example, this article introduces the specific technical reconstruction measures and the implementation effect to provide reference for similar projects.
更新日期/Last Update:
2020-06-17