GUO Tao,WANG Yu,LI Bao-ze,et al.Discussion on Design of Lighting System in the Underground Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(14):99-103.
地下污水处理厂照明系统设计探讨
- Title:
- Discussion on Design of Lighting System in the Underground Wastewater Treatment Plant
- 摘要:
- 近年来地下污水处理厂的建设规模和建设数量都呈上升趋势,地下箱体在亮度的合理需求和照明灯具的设置等方面均有特殊的要求,要根据各功能分区的特点进行有针对性的照明设计。大空间区域采用支架安装LED灯管以实现良好视觉舒适度,复杂空间区域采用泛光灯和LED灯管相结合的方式以方便平时操作维护;随着《消防应急照明和疏散指示系统技术标准》(GB 51309—2018)的实施,需要对应急照明设计做出新的调整,地下污水处理厂的应急照明设计应选择使用A类灯具的集中电源供电系统,应急照明灯具通过消防控制室内的集中应急照明控制器实现集中控制;全厂的照明宜采用智能照明控制的智慧化设计,同时要体现节能理念。
- Abstract:
- In recent years, the construction scale and quantity of underground wastewater treatment plant are on the rise, and the underground box has special requirements in the reasonable demand of brightness and the setting of lighting lamps, so it is necessary to carry out targeted lighting design according to the characteristics of each functional partition. LED lamp tube is installed in large space area to achieve good visual comfort, and floodlight and LED lamp tube are combined in complex space area to facilitate normal operation and maintenance. With the implementation of the Technical Standard for Fire Emergency Lighting and Evacuate Indicating System (GB 51309-2018), new adjustments need to be made to the design of emergency lighting. The emergency lighting design of underground wastewater treatment plant should choose the centralized power supply system using A kinds of lamps and lanterns, which is controlled by the centralized emergency lighting controller in the control room. It can be advisable to use intelligent lighting control system in underground wastewater treatment plant, which could embody the idea of energy saving.
相似文献/References:
[1]牛樱,仲崇军,李胜.大型地下市政+工业混合污水处理厂兼顾人防设计案例[J].中国给水排水,2021,37(14):73.
NIU Ying,ZHONG Chong-jun,LI Sheng.Design Case of Large Underground Municipal and Industrial Mixed Wastewater Treatment Plant with Civil Air Defense Function[J].China Water & Wastewater,2021,37(14):73.
[2]徐进.地下式污水处理厂电气设备除湿方式比较研究[J].中国给水排水,2022,38(14):38.
XUJin.Comparative Study on Dehumidification Methods of Electrical Equipment in Underground Sewage Treatment Plant[J].China Water & Wastewater,2022,38(14):38.
[3]田海成,杨曦凯,焦文海,等.AAOA+MBR工艺用于济南东客站地下污水处理厂[J].中国给水排水,2023,39(22):78.
TIANHai-cheng,YANGXi-kai,JIAOWen-hai,et al.Application of AAOA-MBR Process in Jinan Dongkezhan Underground Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(14):78.
[4]张真伟,张诗雄,陈俊,等.全重力流进水的地下污水处理厂防淹设计[J].中国给水排水,2024,40(10):69.
ZHANGZhen-wei,ZHANGShi-xiong,CHENJun,et al.Anti-flooding Design of Underground Sewage Treatment Plant with Gravity- flow Inflow[J].China Water & Wastewater,2024,40(14):69.
[5]李洋洋,彭文峰,雷琳慧,等.基于CFD的地下污水厂无风管式通风系统效果模拟[J].中国给水排水,2024,40(17):104.
LIYang-yang,PENGWen-feng,LEILin-hui,et al.Simulation Effect of Ductless Ventilation System in Underground Wastewater Treatment Plants Based on CFD[J].China Water & Wastewater,2024,40(14):104.