WUWei,ZHOUChen,WUHao,et al.Design Optimization of a Water Intake Project in Huaihe River Basin[J].China Water & Wastewater,2022,38(4):82-87.
淮河流域取水工程设计优化分析
- Title:
- Design Optimization of a Water Intake Project in Huaihe River Basin
- Keywords:
- intake head; pipe jacking; dike settlement; stratum loss; PECK empirical method
- 摘要:
- 颍上县城市地表水厂及配套管网工程总规模为18×104 m3/d,其中取水工程包括取水头部、水源厂及取水泵房,以及两条DN1 400钢管引水管线。该工程根据水文及地质等资料,优化了工程选址和方案,采用岸边式取水头部,枯水期沉井施工,避免了在滩地水下开挖作业,既缩减了工期也节省了造价,降低了施工风险。取水泵房采用便于管理的堤内式泵房,双格沉井施工,沉井周围布置一排高压旋喷桩作为隔离桩,减小沉井下沉对大堤的影响。工程中引水管线采用顶管方式穿越大堤,施工中必然会造成地层损失,引发大堤沉降,采用PECK经验法对沉降进行估算,并采取高压摆喷注浆对顶管扰动后的土体进行再次加固。目前该工程已顺利通水,运行状况良好。
- Abstract:
- The total scale of urban surface water plant and supporting pipe network project in Yingshang County is 18×104 m3/d. The water intake project includes intake head, water source plant, pumping house and two DN1 400 steel pipes water diversion pipelines. The site selection and scheme of the project were optimized according to hydrology and geological data. The selection of shore-type water intake head and caisson construction in dry season avoided underwater excavation in the beaches, reduced the construction period, saved the construction cost and reduced the construction risk. The pumping house is dike pump house which is easy to manage. It was constructed by double?cell caisson method, and a row of high?pressure jet grouting piles were arranged around the caisson as isolation piles to reduce the impact of caisson sinking on the dike. In the project, the water diversion pipeline crossed the dike by using pipe jacking method. However, the construction would inevitably cause stratum loss and settlement of the dike. Therefore, the settlement of the dike was estimated by PECK empirical method, and the soil disturbed by pipe jacking was reinforced again by high-pressure swing jet grouting. At present, the project has successfully delivered water and runs well.
相似文献/References:
[1]周蓉,王绍贵,闫新秀.韶关市第三污水处理厂进厂干管穿越北江段设计优化[J].中国给水排水,2022,38(8):121.
ZHOURong,WANGShao-gui,YANXin-xiu.Design Optimization of Shaoguan No. 3 Wastewater Treatment Plant Incoming Trunk Main Crossing Beijiang River Section[J].China Water & Wastewater,2022,38(4):121.
[2]邓章铁,杨圣虎,吏细歌,等.超深长距离顶管对接施工关键技术研究与应用[J].中国给水排水,2023,39(2):125.
DENGZhang-tie,YANGSheng-hu,LIXi-ge,et al.Research and Application of Key Technology for Super Deep and Long Distance Pipe Jacking Butt Joint Construction[J].China Water & Wastewater,2023,39(4):125.
[3]王植林,罗宏伟,汪勇.浅滩型湖床长距离取水工程设计与施工关键技术[J].中国给水排水,2023,39(12):68.
WANGZhi-lin,LUOHong-wei,WANGYong.Design and Key Construction Technology of Long-distance Water Intake Project in Shallow Lake Bed[J].China Water & Wastewater,2023,39(4):68.
[4]郑平,崔旭辉,卢海军.超长距离顶管管道上浮控制实施时机的研究[J].中国给水排水,2023,39(20):120.
ZHENGPing,CUIXu-hui,LUHai-jun.Research on the Implementation Timing of Pipe Floating Control for Ultra?long Distance Pipe Jacking[J].China Water & Wastewater,2023,39(4):120.