HUBang,YANGYan-kun,ZHANGXin,et al.Design of Industrial Wastewater Treatment System in Chemical Industrial Park Based on Classification and Quality[J].China Water & Wastewater,2023,39(6):66-70.
化工园区工业污水“分类分质”处理工艺系统设计
- Title:
- Design of Industrial Wastewater Treatment System in Chemical Industrial Park Based on Classification and Quality
- Keywords:
- chemical industrial park; Fenton oxidation; high efficient precipitation; activated carbon; in-situ adsorption and desorption
- 摘要:
- 为提高化工园区环境治理水平,太湖流域某化工园区建设专业的污水处理厂用于处理化工废水。通过“一企一管,明管(专管)输送”方式收集园区内各企业化工废水后排放至园区专业污水处理厂,按照“分类收集、分质处理”的方式进行集中处理。污水处理厂设计规模为1.0×104 m3/d,其中有机化工废水采用“调节均质+水解酸化+AO生化+芬顿氧化+高效沉淀+活性炭原位吸附脱附”组合工艺处理,无机化工废水采用“调节均质+高效沉淀”工艺处理,出水水质能稳定达到《太湖地区城镇污水处理厂及重点工业行业主要水污染物排放限值》(DB 32/1072—2018)及《化学工业水污染物排放标准》(DB 32/939—2020)排放限值要求。平均废水处理成本约为8.466元/m3。
- Abstract:
- To improve the environmental treatment level of chemical industrial park, a professional wastewater treatment plant was built to treat chemical wastewater in a chemical industrial park in Taihu basin. Chemical wastewater from all enterprises in the park is collected through “one enterprise one pipe and open channel or special pipe transportation” and discharged to the wastewater treatment plant, and treated based on the principle of “classified collection and treatment”. The design scale of the wastewater treatment plant is 1.0×104 m3/d. The organic chemical wastewater is treated by the combined process of regulating homogenization, hydrolytic acidification, AO biochemical process, Fenton oxidation, high efficient precipitation and activated carbon in-situ adsorption and desorption, while the inorganic chemical wastewater is treated by the process of regulating homogenization and high efficient precipitation. The effluent quality stably meets the limit specified in Discharge Standard of Main Water Pollutants for Municipal Wastewater Treatment Plant & Key Industries of Taihu Area (DB 32/1072-2018) and Discharge Standard of Water Pollutants for Chemical Industry (DB 32/939-2020). The average wastewater treatment cost is approximately 8.466 yuan/m3.
相似文献/References:
[1]潘名宾,潘维龙,陈燕波,等.某大型综合化工园区污水处理厂分质提标工程设计[J].中国给水排水,2021,37(18):70.
PAN Ming-bin,PAN Wei-long,CHEN Yan-bo,et al.Design of Separate Upgrading Project of a Wastewater Treatment Plant in a Large Comprehensive Chemical Park[J].China Water & Wastewater,2021,37(6):70.
[2]曾明,郭庆贺,徐贵达,等.化工园区综合污水厂的工程改造及运行分析[J].中国给水排水,2022,38(18):101.
ZENGMing,GUOQing-he,XUGui?da,et al.Reconstruction and Operation Analysis of WWTP in a Chemical Industry Park[J].China Water & Wastewater,2022,38(6):101.
[3]贾莉,傅妍芳,龚淑芬.化工园区污水处理一级A提标改造工艺及运行分析[J].中国给水排水,2022,38(20):124.
JIALi,FUYan-fang,GONGShu-fen.Analysis on First Level A Criteria Upgrading Process and Operation of Wastewater Treatment in a Chemical Industrial Park[J].China Water & Wastewater,2022,38(6):124.
[4]王小兵,林岳.循环经济产业园废水零排放的工艺优选与实践[J].中国给水排水,2022,38(22):116.
WANGXiao-bing,LINYue.Optimization and Practice of Wastewater Zero Discharge Process in a Circular Economy Industrial Park[J].China Water & Wastewater,2022,38(6):116.
[5]洪卫,梁世华,张增国,等.油系针状焦生产废水处理工程设计及运行效果[J].中国给水排水,2023,39(16):94.
HONGWei,LIANGShi-hua,ZHANGZeng-guo,et al.Process Design and Operation Effect of Oil-based Needle Coke Wastewater Treatment Project[J].China Water & Wastewater,2023,39(6):94.
[6]周呈,周宇翔,叶阳阳,等.南通某化工园区污水处理厂降本增效分阶段改造[J].中国给水排水,2024,40(12):114.
ZHOUCheng,ZHOUYu-xiang,YEYang-yang,et al.Phased Upgrading and Reconstruction of a Chemical Industry Park WWTP in Nantong to Reduce Cost and Increase Efficiency[J].China Water & Wastewater,2024,40(6):114.