[1]吴迪,王宇婷.深圳固戍水质净化厂二期工程EPC项目BIM技术应用[J].中国给水排水,2023,39(22):66-72.
 WUDi,WANGYu-ting.Application of BIM Technology in Gushu Water Purification Plant Phase Ⅱ EPC Project in Shenzhen[J].China Water & Wastewater,2023,39(22):66-72.
点击复制

深圳固戍水质净化厂二期工程EPC项目BIM技术应用

相似文献/References:

[1]李亮.MBBR在CAST工艺扩容提质工程中的应用[J].中国给水排水,2021,37(20):87.
 LI Liang.Application of MBBR in CAST Process Expanding and Upgrading Project[J].China Water & Wastewater,2021,37(22):87.
[2]杨明雪,高娜,李凌云,等.食品工业废水委托水质净化厂处理的实践与探究[J].中国给水排水,2023,39(9):122.
 YANGMing-xue,GAONa,LILing-yun,et al.Practice and Exploration of Outsourced Treatment of Food Industrial Wastewater in Sewage Purification Plant[J].China Water & Wastewater,2023,39(22):122.
[3]杨晓辉,丁纯健,赵文秀,等.水质净化厂供氧系统配置优化计算[J].中国给水排水,2024,40(14):51.
 YANGXiao-hui,DINGChun-jian,ZHAOWen-xiu,et al.Optimized Calculation of Oxygen Supply System Configuration in a Water Purification Plant[J].China Water & Wastewater,2024,40(22):51.

更新日期/Last Update: 2023-11-17