LIUZhuang-quan.Zero Discharge and Resource Recovery in LeachateTreatment from a Domestic Waste Incineration Power Plant[J].China Water & Wastewater,2025,41(10):113-118.
生活垃圾焚烧厂渗沥液零排放与资源回收实践
- Title:
- Zero Discharge and Resource Recovery in LeachateTreatment from a Domestic Waste Incineration Power Plant
- Keywords:
- leachate; MBR; membrane treatment; concentrate; co-combustion; full quantitative treatment; zero discharge; resource recovery
- 摘要:
- 以南京江北生活垃圾焚烧发电厂800 m3/d渗沥液处理工程为例,介绍其全量化处理和资源回收系统。渗沥液处理采用预处理+UBF+两级A/O-MBR+NF+RO组合工艺,NF浓缩液处理采用物料膜减量+回喷焚烧炉工艺,RO浓缩液处理采用软化+STRO减量+石灰制浆工艺,沼气经预处理后喷入焚烧炉掺烧发电。实践表明,该项目运行稳定,系统回收率达到83.0%;出水直接用作循环冷却补水,沼气入炉掺烧发电量满足渗沥液处理系统自身用电量需要。该工程做到了渗沥液的全量化处理和零排放,实现了废水的再生利用和资源回收。
- Abstract:
- This paper presents the zero discharge and resource recovery practices at the Nanjing Jiangbei domestic waste incineration power plant,which processes 800 m3/d leachate. The treatment system integrates multiple technologies,including pretreatment, upflow anaerobic sludge blanket filter reactor (UBF), two-stage A/O-MBR, nanofiltration(NF), and reverse osmosis(RO). The NF concentrate is treated using membrane reduction followed by back-spray incineration, while the RO concentrate undergoes softening, STRO reduction, and lime slurry treatment. Additionally, pretreated biogas is sprayed into the incinerator for co-combustion to generate electricity. The system operates stably with a recovery rate of over 83.0%. The treated effluent is reused for cooling water supplementation, and the electricity generated from biogas co-combustion meets the power demands of the leachate treatment system. This project demonstrates a successful implementation of zero discharge leachate treatment,achieving full resource recovery and wastewater reuse.
相似文献/References:
[1]毛宇洛,石文鹏.江西某厂网一体化项目污水厂调试运行实例[J].中国给水排水,2022,38(4):12.
MAO Yu-luo,SHI Wen-peng.A Practical Example of Commissioning and Operation of a Wastewater Treatment Plant in a Plant?Network Integration Project in Jiangxi[J].China Water & Wastewater,2022,38(10):12.
[2]李一龙,包宇,邸文正,等.高排放标准下分段进水多级AO+MBR工艺的设计[J].中国给水排水,2022,38(4):76.
LIYi-long,BAOYu,DIWen-zheng,et al.Design of Step-feed Multi-stage AO+MBR Process under High Discharge Standard[J].China Water & Wastewater,2022,38(10):76.
[3]李志超,肖宁,林蔓,等.MBBR耦合MBR用于东北某低温高排放标准污水厂[J].中国给水排水,2022,38(14):77.
LIZhi-chao,XIAONing,LINMan,et al.Application of MBBR Coupled with MBR Process in a Stringent Discharge Standard Wastewater Treatment Plant in Northeast China at Low Temperature[J].China Water & Wastewater,2022,38(10):77.
[4]黄珠慧,朱艳臣,王久龙,等.混凝+两级A/O+MBR工艺处理粪便滤后液[J].中国给水排水,2022,38(24):115.
HUANGZhu-hui,ZHUYan-chen,WANGJiu-long,et al.Treatment of Fecal Filtrate by a Combined Process of Coagulation, Two-stage A/O and MBR[J].China Water & Wastewater,2022,38(10):115.
[5]王凤雪,张新波,尚禹彤,等.MBBR—MBR对磺胺嘧啶的去除及膜污染特性[J].中国给水排水,2023,39(1):80.
WANGFeng-xue,ZHANGXin-bo,SHANGYu-tong,et al.MBBR-MBR System for Removal of Sulfadiazine and Its Membrane Fouling Characteristics[J].China Water & Wastewater,2023,39(10):80.
[6]刘浩,臧海龙,耿安锋,等.青岛李村河污水处理厂类Ⅳ类标准提标扩建工程设计[J].中国给水排水,2023,39(2):52.
LIUHao,ZANGHai-long,GENGAn-feng,et al.Design of Quasi Class Ⅳ Discharge Standard Upgrading and Expansion Project in Qingdao Licunhe Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(10):52.
[7]田海成,杨红红,焦文海,等.AAO+MBR组合工艺各工段设计要点[J].中国给水排水,2023,39(6):71.
TIANHai-cheng,YANGHong-hong,JIAOWen-hai,et al.Key Points for Each Section Design of AAO and MBR Combined Process[J].China Water & Wastewater,2023,39(10):71.
[8]刘强,张磊.UASB+两级AO+MBR工艺处理高浓度原料药废水[J].中国给水排水,2023,39(10):139.
LIUQiang,ZHANG Lei.Engineering Design of UASB, Two-stage AO, and MBR Process for Treating High Concentration API Wastewater[J].China Water & Wastewater,2023,39(10):139.
[9]黄青,杨平,杨忠启,等.MBBR和MBR工艺的污水处理效果与碳排放分析[J].中国给水排水,2023,39(16):99.
HUANGQing,YANGPing,YANGZhong-qi,et al.Analysis on the Engineering Effect and Carbon Emission of MBBR and MBR Processes for Treating Sewage[J].China Water & Wastewater,2023,39(10):99.
[10]钟志君,朱孟建,甘玲,等.预处理/UASB/水解酸化/MBR工艺处理中药废水[J].中国给水排水,2025,41(8):109.